Revisions to accelerated corrosion test method for post-tensioning grout

被引:0
|
作者
Department of Civil Engineering, Universidade Federal do Rio Grande do Sul , Porto Alegre, Brazil [1 ]
不详 [2 ]
不详 [3 ]
不详 [4 ]
不详 [5 ]
不详 [6 ]
不详 [7 ]
不详 [8 ]
不详 [9 ]
不详 [10 ]
不详 [11 ]
不详 [12 ]
机构
来源
ACI Mater J | 2007年 / 2卷 / 123-128期
关键词
Grouting;
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [31] POST-TENSIONING SYSTEM SURVEILLANCE PROGRAM
    Drew, George E.
    1979, 105 (02): : 347 - 357
  • [32] DEMOLITION POST-TENSIONING STILL BOGEYMAN
    不详
    CONCRETE, 1973, 7 (02): : 42 - 42
  • [33] POST-TENSIONING APPLICATIONS FOR BRIDGE REHABILITATION
    LAMBERSON, EA
    CONSTRUCTION CONTRACTING, 1983, 65 (02): : 24 - 24
  • [34] Specifications for Unbonded Post-Tensioning Tendons
    1600, American Concrete Institute (38):
  • [35] Linear Polarization Resistance Tests on Corrosion Protection Degree of Post-Tensioning Grouts
    Pacheco, Alexandre R.
    Schokker, Andrea J.
    Volz, Jeffery S.
    Hamilton, H. R. , III
    ACI MATERIALS JOURNAL, 2011, 108 (04) : 365 - 370
  • [36] FRP post-tensioning of laminated timber bridges
    Dagher, HJ
    Schmidt, AL
    Abdel-Magid, B
    Iyer, S
    EVOLVING TECHNOLOGIES FOR THE COMPETITIVE EDGE, BOOKS 1 AND 2, 1997, 42 : 933 - 938
  • [37] Post-tensioning cuts steel bridge costs
    Spaans, Leo
    Modern Steel Construction, 1994, 34 (09): : 38 - 43
  • [38] Assessing Passivation and Corrosion of Post-tensioning Strand in Grouts Under Chloride Salt Exposure
    Shakouri, Mahmoud
    Abraham, Ojo Friday
    Vaddey, Naga Pavan
    SMART & SUSTAINABLE INFRASTRUCTURE: BUILDING A GREENER TOMORROW, ISSSI 2023, 2024, 48 : 927 - 939
  • [39] BRIDGE REHABILITATION AND STRENGTHENING BY CONTINUOUS POST-TENSIONING
    VERNIGOR.E
    MARCIL, JRM
    SLATER, WM
    AIKEN, RV
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1969, 14 (02): : 88 - &
  • [40] POST-TENSIONING SYSTEMS - A DESCRIPTION OF THE METHODS AND THE HARDWARE
    不详
    CONCRETE CONSTRUCTION, 1983, 28 (04): : 323 - &