The smart city old industrial buildings renovation: based on improved greedy algorithm

被引:0
|
作者
Chen X. [1 ]
Liu Y. [1 ]
Xiao H. [1 ]
Hou J. [2 ]
Zhang S. [3 ]
机构
[1] School of Architecture and Civil Engineering, Jinggangshan University, Ji'an
[2] Jiangxi Provincial Architectural Design and Research Institute Group Co. Ltd, Nanchang
[3] Sichuan Gushi Engineering Technology Co. Ltd, Chengdu
关键词
action space; backtracking algorithm; brickwork & masonry; construction; greedy algorithm; layout optimisation; old industrial building; renewal; smart city;
D O I
10.1680/jsmic.23.00012
中图分类号
学科分类号
摘要
With urban development and industrial restructuring, many old industrial buildings are left unused, making the renewal of such buildings a crucial aspect of urban construction. To meet the growing need for intelligent and efficient urban construction, this study proposes a greedy algorithm that considers the update of action spaces (AP-GA) to optimise the basic work of old building renovation-the layout of rows of tiles. The algorithm is optimised using the idea of action space update and backtracking. Real testing shows that the optimisation method provides the highest optimisation rate (18.20%) for AP-GA and reduces the number of cut bricks. Although the running time is slightly longer than that of the original algorithm, the brick integrity of the layout is significantly improved. When compared with other algorithms, the optimised AP-GA has the shortest average running time of 580.1 μs, demonstrating its effectiveness in the layout of rows of bricks. This new algorithm provides a more efficient and excellent method for the renewal and renovation of old industrial buildings, broadening the research perspective in the field. © 2024 Emerald Publishing Limited: All rights reserved.
引用
收藏
页码:93 / 102
页数:9
相关论文
共 50 条
  • [21] Coordination of the Charging of Massive Electric Vehicles Based on Improved Greedy Algorithm
    Chen, Jingpeng
    Ai, Qian
    Gao, Yang
    2015 2ND ASIAN PACIFIC CONFERENCE ON ENERGY, ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (APEESD 2015), 2015, : 547 - 552
  • [22] An improved snake model based on image gravitation and optimized greedy algorithm
    Li Guo You
    PROCEEDINGS OF THE 26TH CHINESE CONTROL CONFERENCE, VOL 4, 2007, : 544 - 548
  • [23] LDC: A lightweight dada consensus algorithm based on the blockchain for the industrial Internet of Things for smart city applications
    Zhang, Wenbo
    Wu, Zonglin
    Han, Guangjie
    Feng, Yongxin
    Shu, Lei
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2020, 108 : 574 - 582
  • [24] A personalised travel route recommendation method based on an improved greedy algorithm
    Shang, Qun
    INTERNATIONAL JOURNAL OF COMPUTING SCIENCE AND MATHEMATICS, 2023, 17 (04) : 399 - 413
  • [25] A dynamic traffic signal scheduling system based on improved greedy algorithm
    Sun, Guangling
    Qi, Rui
    Liu, Yulong
    Xu, Feng
    PLOS ONE, 2024, 19 (03):
  • [26] Path Planning of AS/RS Based on Cost Matrix and Improved Greedy Algorithm
    Li, Dongdong
    Wang, Lei
    Geng, Sai
    Jiang, Benchi
    SYMMETRY-BASEL, 2021, 13 (08):
  • [27] Improved Knapsack Problem Algorithm based on Greedy Strategy for Tower Nesting
    Cai, Libin
    Wei, Shen
    Yuan, Jinghua
    Li, Li
    TRENDS IN CIVIL ENGINEERING, PTS 1-4, 2012, 446-449 : 592 - 595
  • [28] Industrial defect detection and location based on greedy particle swarm optimization algorithm
    Tang, Yaorui
    Yang, Bo
    Peng, Hong
    Luo, Xiaohui
    INTERNATIONAL JOURNAL OF PARALLEL EMERGENT AND DISTRIBUTED SYSTEMS, 2024,
  • [29] A Balanced Scheduling Method of Smart City Enterprise Resource Information Based on Improved Ant Colony Algorithm
    Chen, Suqing
    JOURNAL OF TESTING AND EVALUATION, 2023, 51 (03) : 1265 - 1276
  • [30] A novel network security algorithm based on improved support vector machine from smart city perspective
    Zou, Xiang
    Cao, Jinghua
    Guo, Quan
    Wen, Tao
    COMPUTERS & ELECTRICAL ENGINEERING, 2018, 65 : 67 - 78