SPS tools for capital project planning analysis

被引:0
|
作者
Boskers N. [1 ]
AbouRizk S.M. [1 ]
机构
[1] Springwood Developments, Edmonton, AB T5N 1K4
关键词
Capital projects; Construction project planning; Intelligent forecasting; Simulation models;
D O I
10.1504/IJSPM.2010.032658
中图分类号
学科分类号
摘要
This paper presents the development of a Special Purpose Simulation (SPS) template for capital planning on large-scale infrastructure construction projects. The template targets outputs of greatest interest to the planner: project duration and cost estimate, using the Box Jenkins method of forecasting. The developed tool was tested in a case study involving roadway restructuring in Edmonton, Canada. The case study is detailed here for purposes of illustration. Seven models were simulated and analysed, showing the relative influence of fixed rates and mean rates on forecasting, and that subjective analysis procedures can cause disadvantageous decision-making. The case study was also used to perform risk analysis for the City of Edmonton. Copyright © 2010 Inderscience Enterprises Ltd.
引用
收藏
页码:58 / 66
页数:8
相关论文
共 50 条
  • [1] SPS TOOLS FOR CAPITAL PLANNING PROJECT ANALYSIS
    Boskers, Nathan
    AbouRizk, Simaan M.
    7TH INTERNATIONAL WORKSHOP ON MODELING & APPLIED SIMULATION, 2008, : 55 - 62
  • [2] Shot planning and analysis tools on the NIF project
    Beeler, R., Jr.
    Casey, A.
    Conder, A.
    Fallejo, R.
    Flegel, M.
    Hutton, M.
    Jancaitis, K.
    Lakamsani, V.
    Potter, D.
    Reisdorf, S.
    Tappero, J.
    Whitman, P.
    Carr, W.
    Liao, Z.
    FUSION ENGINEERING AND DESIGN, 2012, 87 (12) : 2020 - 2023
  • [3] PLANNING A CAPITAL PROJECT
    PATTERSON, D
    UZ, JR
    TAPPI JOURNAL, 1988, 71 (08): : 118 - 122
  • [4] CAPITAL PROJECT-PLANNING
    STACHA, JH
    WATER-ENGINEERING & MANAGEMENT, 1981, 128 (01): : 20 - +
  • [5] PROJECT-PLANNING TOOLS
    BURNS, RJ
    POPULAR COMPUTING, 1984, 3 (12): : 79 - 80
  • [6] IMPROVING PERFORMANCE OF CAPITAL PROJECT PLANNING
    HENDERSON, R
    COST AND MANAGEMENT, 1971, 45 (05): : 33 - 41
  • [7] Capital project planning for a circular economy
    Sanchez, Benjamin
    Haas, Carl
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (06) : 303 - 312
  • [9] New Tools in Project Planning: An Introduction to the Rodenbeck Project Tower
    Rodenbeck, Phillip
    Schumacher, Terry
    PICMET '12: PROCEEDINGS - TECHNOLOGY MANAGEMENT FOR EMERGING TECHNOLOGIES, 2012, : 2492 - 2505
  • [10] CAPITAL PROJECT PLANNING AND EVALUATION BY LINEAR PROGRAMMING
    FRANCE, H
    ELECTRONISCHE DATENVERARBEITUNG, 1969, 11 (01): : 31 - &