Real temperature load and the influence on the working performance of super-high arch dam

被引:0
|
作者
Zhang, Guo-Xin [1 ]
Chen, Pei-Pei [1 ,2 ]
Zhou, Qiu-Jing [1 ]
机构
[1] China Institute of Water Resources and Hydropower Research, Beijing 100038, China
[2] Faculty of Water Resources and Hydroelectric Engineering, Xi'an University of Technology, Xi'an 710048, China
来源
关键词
Water temperature;
D O I
10.13243/j.cnki.slxb.2014.02.001
中图分类号
学科分类号
摘要
引用
收藏
页码:127 / 134
相关论文
共 50 条
  • [21] Analysis of interaction of overall stability of Wudongde super-high arch dam and underground powerhouse
    Lin, Peng
    Wang, Cheng
    Weng, Yonghong
    Cao, Quxiu
    Hu, Qingyi
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2014, 33 (11): : 2236 - 2246
  • [22] Experimental Study on Cracking, Reinforcement, and Overall Stability of the Xiaowan Super-High Arch Dam
    Peng Lin
    Weiyuan Zhou
    Hongyuan Liu
    Rock Mechanics and Rock Engineering, 2015, 48 : 819 - 841
  • [23] Analysis and evaluation of optimizing design for foundation excavation of xiluodu super-high arch dam
    Wang, Renkun
    Lin, Peng
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2008, 27 (10): : 2010 - 2018
  • [24] Discusion for standard and measure of temperature controlling in super-high arch dams
    Zhang, G.-X. (Zhanggx@iwhr.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (43):
  • [25] Study on Method for Controlling Opening and Closing Mechanism of Transverse Joint of Super-high Arch Dam
    Liu Youzhi
    Zhang Guoxin
    Fan Qixiang
    Chen Wenfu
    Li Jintao
    2020 4TH INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2020), 2020, 510
  • [26] A monitoring model for the stress on a super-high arch dam during pre-impoundment construction
    Niu, Jingtai
    Luo, Xiang
    Deng, Zhiping
    Zhang, Yang
    Guo, Yingjia
    Wang, Zhiqiang
    WATER SUPPLY, 2020, 20 (08) : 3604 - 3614
  • [27] Safety threshold of blasting vibration velocity in foundation excavation of Baihetan super-high arch dam
    Wenjun Xia
    Wenbo Lu
    Gaohui Wang
    Peng Yan
    Da Liu
    Zhendong Leng
    Bulletin of Engineering Geology and the Environment, 2020, 79 : 4999 - 5012
  • [28] Safety threshold of blasting vibration velocity in foundation excavation of Baihetan super-high arch dam
    Xia, Wenjun
    Lu, Wenbo
    Wang, Gaohui
    Yan, Peng
    Liu, Da
    Leng, Zhendong
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2020, 79 (09) : 4999 - 5012
  • [29] A Flexible Network Structure for Temperature Monitoring of a Super High Arch Dam
    Lin, Peng
    Li, Qingbin
    Hu, Hang
    INTERNATIONAL JOURNAL OF DISTRIBUTED SENSOR NETWORKS, 2012,
  • [30] Study on Deformation and Control Measures of Columnar Jointed Basalt for Baihetan Super-High Arch Dam Foundation
    Qixiang Fan
    Zhilin Wang
    Jianrong Xu
    Mengxia Zhou
    Quan Jiang
    Guo Li
    Rock Mechanics and Rock Engineering, 2018, 51 : 2569 - 2595