Reliability past-evaluation to expressway construction projects

被引:0
|
作者
School of Civil Engineering, Chang'an University, Xi'an 710061, China [1 ]
不详 [2 ]
机构
来源
Chang'an Daxue Xuebao | 2006年 / 6卷 / 69-72期
关键词
9;
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [41] Expressway to Votes: Infrastructure Projects and Voter Persuasion
    Akbulut-Yuksel, Mevlude
    Okoye, Dozie
    Turan, Belgi
    ECONOMIC JOURNAL, 2023, 134 (657): : 48 - 94
  • [42] Evaluation on Competitiveness of Construction projects from the perspective of Construction main bodies
    Li Shi-rong
    Cheng Guang-kun
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7828 - +
  • [43] Quality Supervision Evaluation of Agent Construction Projects in Construction Stage of GIP
    Wu, Yunna
    Wang, Heping
    Zhang, Shuo
    Li, Zezhong
    PROGRESS IN ENVIRONMENTAL PROTECTION AND PROCESSING OF RESOURCE, PTS 1-4, 2013, 295-298 : 2515 - 2522
  • [44] Analysis of Human Error Risk with Human Reliability Methods in Construction Projects
    Sinabariba, M. A. Priska
    Ghifari, M. R.
    Muslim, E.
    Moch, B. N.
    2ND INTERNATIONAL CONFERENCE ON INDUSTRIAL AND MANUFACTURING ENGINEERING (ICI&ME 2020), 2020, 1003
  • [45] Assessment Reliability of Businesses as Components in Organizational Structure of Investment Construction Projects
    Morozenko, Andrey
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2016 - SMART CITY, 2017, 106
  • [46] CONSIDERING TRAVEL TIME RELIABILITY AND SAFETY FOR EVALUATION OF CONGESTION RELIEF SCHEMES ON EXPRESSWAY SEGMENTS
    Mehran, Babak
    Nakamura, Hideki
    IATSS RESEARCH, 2009, 33 (01) : 55 - 70
  • [47] Automating schedule review for expressway construction
    Dzeng, RJ
    Tserng, HP
    Wang, WC
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (01): : 127 - 136
  • [48] Corporatization of Expressway Construction and Operation Management
    Ding Jixi
    2013 FOURTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND ENGINEERING APPLICATIONS, 2013, : 221 - 224
  • [49] Quality cost model in expressway construction
    Liu, Zhao-Yang
    Lv, Yong-Bo
    Ren, Yuan
    Yang, Qi Ou
    Li, Jing
    JOURNAL OF INTERDISCIPLINARY MATHEMATICS, 2017, 20 (03) : 681 - 687
  • [50] The Public Private Partnership in Expressway Construction
    Han Hongyun
    PROCEEDINGS OF 2008 CONFERENCE ON REGIONAL ECONOMY AND SUSTAINABLE DEVELOPMENT, 2008, : 699 - 704