Hot bolt clamp addresses corrosion problem

被引:0
|
作者
机构
来源
JPT, Journal of Petroleum Technology | 2014年 / 66卷 / 01期
关键词
Industrial research;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:42 / 43
相关论文
共 50 条
  • [21] Effect of location and type of separating load on joint clamp load and bolt tension
    Nassar, Sayed A.
    Gandham, Satya Vijay Teja
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE 2007, VOL 2: COMPUTER APPLICATIONS/TECHNOLOGY AND BOLTED JOINTS, 2008, : 283 - 294
  • [22] Forward thinking addresses ATSC multipath problem
    Cravotta, N
    EDN, 1999, 44 (19) : 20 - 20
  • [23] The conceptual alternative design for ITER magnet gravity support using clamp bolt
    Hou, B. L.
    Lee, P. Y.
    Gallix, R.
    Fu, Y. K.
    FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 1919 - 1923
  • [24] HOT CLAMP DESIGN FOR LMFBR PIPING SYSTEMS
    KOBAYASHI, T
    TATEISHI, M
    JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 1993, 115 (01): : 47 - 52
  • [25] Tensile behaviors of friction bolt connection with bolt head corrosion damage: Experimental research B
    Kim, In-Tae
    Lee, Jae Min
    Huh, Jungwon
    Ahn, Jin-Hee
    ENGINEERING FAILURE ANALYSIS, 2016, 59 : 526 - 543
  • [26] Bolt-Load Considerations Associated with ‘Hot Bolting’
    Stikvoort, Walther
    Chemical Engineering (United States), 2021, 128 (10): : 31 - 34
  • [27] Metallurgical aspects of rock bolt stress corrosion cracking
    Villalba, Ernesto
    Atrens, Andrej
    MATERIALS SCIENCE AND ENGINEERING A-STRUCTURAL MATERIALS PROPERTIES MICROSTRUCTURE AND PROCESSING, 2008, 491 (1-2): : 8 - 18
  • [28] Hydrogen embrittlement and rock bolt stress corrosion cracking
    Villalba, Ernesto
    Atrens, Andrej
    ENGINEERING FAILURE ANALYSIS, 2009, 16 (01) : 164 - 175
  • [29] Research on Preload Loss Prediction of Clamp Bolt Considering Cable Creep of Galvanized Layer
    Zhou, Yong-Jun
    Jia, Li-Qiang
    Yang, Fan
    Zhao, Yu
    Mu, Feng-Rui
    Zhang, Xin-Hao
    Jing, Wei
    Ding, Li-Xin
    Meng, Guang-Lin
    Zhongguo Gonglu Xuebao/China Journal of Highway and Transport, 2024, 37 (07): : 157 - 167
  • [30] ROBUSTNESS OF DETECTION METHOD FOR CLAMP FORCE AGAINST CONFIGURATION ERROR IN BOLT/NUT ASSEMBLIES
    Hashimura, Shinji
    Kubota, Kai
    Ohmi, Nozomu
    Komatsu, Kyoichi
    PROCEEDINGS OF THE JSME 2020 CONFERENCE ON LEADING EDGE MANUFACTURING/MATERIALS AND PROCESSING, LEMP2020, 2020,