Selection of priority watershed for water environment management

被引:0
|
作者
Choi, Jiyeon [1 ]
Lee, Young Mee [1 ]
Kang, Tae-Woo [1 ]
Ha, Don-Woo [1 ]
Hwang, Seong-Yun [1 ]
Lee, Youngjea [1 ]
Lee, Won-Seok [1 ]
机构
[1] Natl Inst Environm Res, Yeongsan River Environm Res Ctr, Gwangju 61011, South Korea
关键词
NPS; priority management; water environment; water quality; watershed;
D O I
10.1002/wer.11151
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As part of the National Water Management Basic Plan, this study conducted research to identify priority management watersheds in the Yeongsan River basin to respond to changes in water environmental conditions and improve water quality. Analysis of water quality over the past decade revealed that points located in the middle and lower of the Yeongsan River exceeded the target water quality standards. As based on the results, pollution sources and loads indicated that the W-1 watershed, classified as urban areas, exhibited high levels in residential, industrial, and urban landuse characteristics, whereas the W-6 watershed, classified as rural areas, showed high levels in livestock farming, aquaculture, and agricultural landuse (wet and dry filed) categories. To understand the impact of point source (PS) and non-point source (NPS) pollution within the watershed, load duration curve (LDC) analysis was conducted, indicating that downstream segments of all flow ranges exceeded the target water quality standards, necessitating management of both PS and NPS. Multivariate log-linear analysis also confirmed the influence of PS and NPS, suggesting that watershed management should concurrently address both types of pollution. Based on the results, priority management watershed rankings were derived through the calculation of standard and integrated indicators, with the analysis indicating the following order: W-1 > W-6 > W-3 > W-4 > W-2 > W-5 > W-7 > W-8.
引用
收藏
页数:12
相关论文
共 50 条
  • [41] Three breakthroughs confronting China's environment watershed management
    Genfang, C. (cgf0000@ncwu.edu.cn), 1600, Sila Science, University Mah Mekan Sok, No 24, Trabzon, Turkey (31):
  • [42] A windows-based simulator for Yangon watershed environment management
    Ruan, XH
    Wang, DG
    ENVIRONMENTAL HYDRAULICS AND ECO-HYDRAULICS, THEME B, PROCEEDINGS: 21ST CENTURY: THE NEW ERA FOR HYDRAULIC RESEARCH AND ITS APPLICATIONS, 2001, : 145 - 151
  • [43] Water yield modeling in the watershed: a framework for sustainable water resources management
    Felegari, Marzieh
    Sadr, Maryam Kiani
    Abdollahi, Sedighe
    Golkarian, Hamta
    SUSTAINABLE WATER RESOURCES MANAGEMENT, 2024, 10 (04)
  • [44] WASTE-WATER MANAGEMENT RISES TO TOP PRIORITY
    RITTENHOUSE, RC
    POWER ENGINEERING, 1992, 96 (10) : 21 - 26
  • [45] Swimming Against the Tide: Making Water Management a Priority
    Mascone, Cynthia F.
    CHEMICAL ENGINEERING PROGRESS, 2016, 112 (04) : 3 - 3
  • [46] Adaptation: A Vital Priority for Sustainable Water Resources Management
    Kolokytha, Elpida
    WATER, 2022, 14 (04)
  • [47] Priority setting for invasive species management by the water industry
    Gallardo, Belinda
    Aldridge, David C.
    WATER RESEARCH, 2020, 178 (178)
  • [48] Water quality management in the Kaoping River watershed, Taiwan
    Kao, CM
    Chen, KF
    Liao, YL
    Chen, CW
    WATER SCIENCE AND TECHNOLOGY, 2003, 47 (7-8) : 209 - 216
  • [49] Evolutionary multiobjective optimization in watershed water quality management
    Dorn, JL
    Ranjithan, SR
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, PROCEEDINGS, 2003, 2632 : 692 - 706
  • [50] Water and soil conservation is the basic measure of watershed management
    Jiao, JR
    PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON COMPREHENSIVE WATERSHED MANAGEMENT (ISWM-'98), 1998, : 35 - 40