Different due-window assignment scheduling with deterioration effects

被引:0
|
作者
Zhang, Yurong [1 ]
Wang, Xi [2 ]
Zhang, Li-Han [3 ]
Jia, Xue [3 ]
Wang, Ji-Bo [3 ]
机构
[1] Xian Polytech Univ, Sch New Media Art, Xian, Shaanxi, Peoples R China
[2] Univ Nottingham, Sch Educ, Univ Pk, Nottingham, England
[3] Shenyang Aerosp Univ, Sch Sci, Shenyang, Liaoning, Peoples R China
关键词
Scheduling; Due-window assignment; Deterioration effect; Branch-and-bound algorithm; DEPENDENT PROCESSING TIMES; SINGLE-MACHINE; COMMON; MINIMIZE; JOBS;
D O I
10.1007/s10878-024-01223-w
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies a due-window assignment scheduling problem with deterioration effects on a single-machine. Under different due-window assignment, i.e., the due-window of a job without any restriction, our goal is to make a decision on the optimal due-window and sequence of all jobs to minimize the weighted sum of earliness and tardiness, number of early and delayed, due-window starting time and size. We present properties of the optimal solutions, for some special cases, we prove that the problem can be solved in polynomial time. For the general case, we present a lower bound and an upper bound (i.e., a heuristic algorithm), then a branch-and-bound algorithm is proposed.
引用
收藏
页数:21
相关论文
共 50 条
  • [21] Due-window assignment scheduling with past-sequence-dependent setup times
    Liu, Weiguo
    Wang, Xuyin
    Wang, Xiaoxiao
    Zhao, Peizhen
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2022, 19 (03) : 3110 - 3126
  • [22] Due-Window Assignment Methods and Scheduling with Generalized Positional-Dependent Weights
    Wang, Ji-Bo
    Wang, Si-Han
    Cao, Kaipeng
    Liu, Mengqi
    Jia, Xue
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (05)
  • [23] Scheduling a maintenance activity and due-window assignment based on common flow allowance
    Mor, Baruch
    Mosheiov, Gur
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (01) : 222 - 230
  • [24] Scheduling Jobs and A Variable Maintenance on A Single Machine with Common Due-window Assignment
    Gong, Jianbo
    Wan, Long
    Luo, Wenchang
    INTERNATIONAL JOURNAL OF APPLIED MATHEMATICS & STATISTICS, 2014, 52 (07): : 81 - 89
  • [25] Single-machine scheduling with common due-window assignment for deteriorating jobs
    Liu, J.
    Wang, Y.
    Min, X.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2014, 65 (02) : 291 - 301
  • [26] Common Due-Window Assignment and Group Scheduling with Position-Dependent Processing Times
    Liu, Shang-Chia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2015, 32 (06)
  • [27] Due-window assignment scheduling problems with position-dependent weights on a single machine
    Wang, Ji-Bo
    Zhang, Bo
    Li, Lin
    Bai, Danyu
    Feng, Yu-Bo
    ENGINEERING OPTIMIZATION, 2020, 52 (02) : 185 - 193
  • [28] Minmax scheduling problems with a common due-window
    Mosheiov, Gur
    Sarig, Assaf
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (06) : 1886 - 1892
  • [29] Multitasking scheduling problems with a common due-window
    Xu, Chen
    Xu, Yinfeng
    Zheng, Feifeng
    Liu, Ming
    RAIRO-OPERATIONS RESEARCH, 2021, 55 (03) : 1787 - 1798
  • [30] Minmax common due-window assignment and scheduling on a single machine with two competing agents
    Mor, Baruch
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 69 (04) : 589 - 602