Design and vibration test of first mirror mount assembly for ITER divertor VUV spectrometer

被引:0
|
作者
Hong, Joohwan [1 ]
Seon, Changrae [1 ]
Won, Min-Gu [1 ,4 ]
Kim, Yoo Kwan [1 ,2 ]
Kim, Boseong [1 ]
Ma, Byungsu [3 ]
Kim, Jaemin [1 ]
Shim, Heejin [1 ]
Cheon, Munseong [1 ]
机构
[1] Korea Inst Fus Energy, Gwahangro 164-148, Daejeon 34133, South Korea
[2] Ajou Univ, Dept Energy Syst Res, Suwon, South Korea
[3] VMT Co Ltd, Idongro 7 Beon Gil 59, Pohangsi, Gyeongbuk, South Korea
[4] Korea Atom Energy Res Inst, 989-111 Daedeok Daero, Daejeon, South Korea
关键词
ITER; VUV; Diagnostic system; First mirror; Silicon carbide; Random vibration analysis; VERTICAL DISPLACEMENT EVENTS;
D O I
10.1016/j.fusengdes.2024.114693
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The divertor vacuum ultraviolet (VUV) spectrometer is a diagnostic system in the ITER tokamak, monitoring impurity content and behavior in the divertor region. The first mirror of the spectrometer, made of silicon carbide (SiC), is exposed to harsh environmental conditions, including high temperatures and significant inertial loads from electromagnetic disruption events. To ensure its reliable performance, we have designed and tested a robust mirror holder assembly. This paper introduces a novel design of the first mirror holder assembly for the ITER divertor VUV spectrometer and presents the results from comprehensive vibration tests conducted on a fullscale mock-up. The design features a double-holder structure with spring plate assemblies to accommodate thermal expansion and resist vibrational loads. The mock-up underwent a series of resonance search, sine dwell, and random vibration tests, replicating the expected loads during vertical displacement events in ITER. The mirror holder assembly and the dummy mirror successfully withstood the vibration tests without damage, validating the design for the ITER environment. The results demonstrate the robustness and reliability of the mirror holder assembly, ensuring the accurate and reliable operation of the divertor VUV spectrometer in ITER.
引用
收藏
页数:7
相关论文
共 37 条
  • [31] First studies of ITER-diagnostic mirrors in a tokamak with an all-metal interior: results of the first mirror test in ASDEX Upgrade
    Litnovsky, A.
    Matveeva, M.
    Herrmann, A.
    Rohde, V.
    Mayer, M.
    Sugiyama, K.
    Krieger, K.
    Voitsenya, V.
    Vayakis, G.
    Costley, A. E.
    Reichle, R.
    De Temmerman, G.
    Richter, S.
    Breuer, U.
    Buzi, L.
    Moeller, S.
    Philipps, V.
    Samm, U.
    Wienhold, P.
    NUCLEAR FUSION, 2013, 53 (07)
  • [32] Experiences during Design, Fabrication, Assembly and Factory Acceptance Test of the ITER Cryoplant Termination Cold Box
    Patel, P.
    Vaghela, H.
    Muralidhara, S.
    Shukla, V
    Garg, A.
    Das, J.
    Dash, B.
    Madeenavalli, S.
    Chang, H-S
    Grillot, D.
    Sarkar, B.
    Cursan, M.
    Oppolzer, K.
    Sander, F.
    Adler, E.
    ADVANCES IN CRYOGENIC ENGINEERING, 2020, 755
  • [33] Deuterium Balmer/Stark spectroscopy and impurity profiles: First results from mirror-link divertor spectroscopy system on the JET ITER-like wall
    Meigs, A. G.
    Brezinsek, S.
    Clever, M.
    Huber, A.
    Marsen, S.
    Nicholas, C.
    Stamp, M.
    Zastrow, K. -D.
    JOURNAL OF NUCLEAR MATERIALS, 2013, 438 : S607 - S611
  • [34] First principle-based multi-channel integrated modelling in support of the design of the Divertor Tokamak Test facility
    Casiraghi, I
    Mantica, P.
    Koechl, F.
    Ambrosino, R.
    Baiocchi, B.
    Castaldo, A.
    Citrin, J.
    Dicorato, M.
    Frassinetti, L.
    Mariani, A.
    Vincenzi, P.
    Agostinetti, P.
    Aucone, L.
    Balbinot, L.
    Ceccuzzi, S.
    Figini, L.
    Granucci, G.
    Innocente, P.
    Johnson, T.
    Nystrom, H.
    Valisa, M.
    NUCLEAR FUSION, 2021, 61 (11)
  • [35] ITER visible spectroscopy reference system first mirror plasma cleaning in radio -frequency gas discharge - circuit design and plasma effects
    Ushakov, Andrey
    Verlaan, Ad
    Stephan, Ulf
    Steinke, Olaff
    de Bock, Maarten
    Maniscalco, Matthew P.
    Verhoeff, Peter
    FUSION ENGINEERING AND DESIGN, 2020, 154 (154)
  • [36] AUP First Pre-Series Cryo-Assembly Design Production and Test Overview
    Feher, S.
    Ambrosio, G.
    Apollinari, G.
    Baldini, M.
    Bossert, R.
    Carcagno, R.
    Chlachidze, G.
    Dimarco, J.
    Rabehl, R.
    Stoynev, S.
    Strauss, T.
    Vouris, A.
    Prin, H.
    Ramos, D.
    Todesco, E.
    Ferracin, P.
    Vallone, G.
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2024, 34 (05) : 1 - 5
  • [37] Design, Assembly and Test of G-CLEF's Exposure Meter I: Design Trade-off and First Conclusions
    Lupinari, Henrique
    Ben-Ami, Sagi
    Ribeiro, Rafael
    de Oliveira, Claudia Mendes
    Szentgyorgyi, Andrew
    OPTICAL INSTRUMENT SCIENCE, TECHNOLOGY, AND APPLICATIONS III, 2024, 13024