Stakeholder Mapping and Analysis of Off-Site Construction Projects: Utilizing a Power–Interest Matrix and the Fuzzy Logic Theory
被引:0
|作者:
Zhu, Qing
[1
]
Xi, Jiade
[1
]
Hu, Xin
[2
]
Chong, Heap-Yih
[3
,4
]
Zhou, Yijun
[5
]
Lyu, Sainan
[1
]
机构:
[1] School of Civil Engineering, Hefei University of Technology, Hefei,230009, China
[2] School of Architecture and Built Environment, Deakin University, 1 Gheringhap Street, Geelong,VIC,3220, Australia
[3] School of Engineering Audit, Nanjing Audit University, Nanjing,211815, China
[4] School of Design and the Built Environment, Curtin University, Perth,WA,6102, Australia
[5] School of Engineering, Design and Built Environment, Western Sydney University, Locked Bag 1797, Penrith,NSW,2751, Australia
来源:
关键词:
Fuzzy logic;
D O I:
10.3390/buildings14092865
中图分类号:
学科分类号:
摘要:
Stakeholder management is a crucial component in the implementation of off-site construction (OSC) projects, while stakeholder mapping serves as a practical technique to facilitate an in-depth understanding of different project stakeholders. Various topics have been explored in the OSC stakeholder management field, but research on OSC stakeholder analysis based on stakeholder mapping is still lacking. This study addresses this gap by developing two-dimensional (2D) and three-dimensional (3D) stakeholder mapping models. Data were collected from 167 stakeholders involved in OSC projects. The 2D model utilizes a power–interest matrix to classify 12 identified OSC stakeholder groups, while the 3D model further explores these groups by incorporating an additional dimension of stakeholder salience across different stages of project implementation. The results show that OSC stakeholders predominantly fall into the key players or minimal effort categories across various project stages. Key players include the client, modular manufacturer, main contractor, government, and designer, while the public and industry organizations generally require minimal effort. Additionally, stakeholders such as the supervision company, supplier, and subcontractor play key roles at specific stages, with varying levels of salience throughout the project lifecycle, reflecting shifts in their influence and involvement. The findings contribute to stakeholder management knowledge by providing an in-depth understanding of OSC stakeholders’ interrelationships during project implementation, especially through uncovered stakeholder mapping in the OSC field. © 2024 by the authors.