2020 CURRENT PROCESS BENCHMARK FOR THE LAST PLANNER® SYSTEM OF PROJECT PLANNING AND CONTROL

被引:0
|
作者
Ballard, Glenn [1 ]
Tommelein, Iris [1 ]
机构
[1] Project Production Systems Laboratory, University of California, Berkeley, United States
来源
Lean Construction Journal | 2021年 / 2021卷
关键词
D O I
暂无
中图分类号
学科分类号
摘要
98
引用
收藏
页码:53 / 121
相关论文
共 50 条
  • [21] The Usefulness of Adopting the Last Planner System in the Construction Process of Addis Ababa Road Projects
    Limenih, Zenawi Mehari
    Demisse, Belachew Asteray
    Haile, Abenezer Tariku
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [22] PWA PLANNER - A RULE BASED SYSTEM FOR PRINTED WIRING ASSEMBLIES PROCESS PLANNING
    CHANG, TC
    TERWILLIGER, J
    COMPUTERS & INDUSTRIAL ENGINEERING, 1987, 13 (1-4) : 34 - 38
  • [23] Investigating conflicts of expert contractors using the last planner system in building information modeling process
    Amany, Adib
    Taghizade, Katayoon
    Noorzai, Esmatullah
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2020, 18 (06) : 1381 - 1402
  • [24] PROCESS CONTROL SYSTEM PLANNING AND ANALYSIS
    HUTERS, WA
    CHEMICAL ENGINEERING PROGRESS, 1968, 64 (04) : 47 - &
  • [25] Energy Efficient Process Planning System - The ENEPLAN Project
    Calefati, Paolo
    Pandremenos, John
    Fysikopoulos, Apostolos
    Chryssolouris, George
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: COMPETITIVE MANUFACTURING FOR INNOVATIVE PRODUCTS AND SERVICES, AMPS 2012, PT I, 2013, 397 : 119 - 126
  • [26] Application of Last Planner® System in Product Concept Development Phase: Use of Lean Concepts in Academic Project Work
    Sivaganesh, Prashanth
    Ratnayake, R. M. Chandima
    2018 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM), 2018, : 351 - 355
  • [27] Production planning, monitoring and review: comparison between the practices in an urban rail transit megaproject with the Last Planner System
    Belayutham, Sheila
    Jaafar, Rabiatul Nurul Akmar Mohamad
    Ismail, Herda Balqis
    Ibrahim, Che Khairil Izam Che
    TQM JOURNAL, 2022, 34 (03): : 515 - 533
  • [28] PLANNING AND COMMISSIONING A PROCESS-CONTROL SYSTEM
    KRAUS, FJ
    ELECTRONICS AND POWER, 1985, 31 (11-1): : 840 - 843
  • [29] Refinery advanced process control planning system
    Lababidi, HMS
    Kotob, S
    Yousuf, B
    COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (09) : 1303 - 1319
  • [30] Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects
    Perez, Daniel
    Lagos, Camilo
    Alarcon, Luis Fernando
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2022, 148 (01)