2020 CURRENT PROCESS BENCHMARK FOR THE LAST PLANNER® SYSTEM OF PROJECT PLANNING AND CONTROL

被引:0
|
作者
Ballard, Glenn [1 ]
Tommelein, Iris [1 ]
机构
[1] Project Production Systems Laboratory, University of California, Berkeley, United States
来源
Lean Construction Journal | 2021年 / 2021卷
关键词
D O I
暂无
中图分类号
学科分类号
摘要
98
引用
收藏
页码:53 / 121
相关论文
共 50 条
  • [1] Digital Last Planner System Whiteboard for Enabling Remote Collaborative Design Process Planning and Control
    Pikas, Ergo
    Pedo, Barbara
    Tezel, Algan
    Koskela, Lauri
    Veersoo, Markus
    SUSTAINABILITY, 2022, 14 (19)
  • [2] THE LAST PLANNER SYSTEM OF CONSTRUCTION PLANNING AND CONTROL AS A TEACHING AND LEARNING TOOL
    Pellicer, Eugenio
    Cervero, Fernando
    Lozano, Alicia
    Luis Ponz-Tienda, Jose
    INTED2015: 9TH INTERNATIONAL TECHNOLOGY, EDUCATION AND DEVELOPMENT CONFERENCE, 2015, : 4877 - 4884
  • [3] Extending the last planner system® to the entire project
    Ballard, Glenn
    Vaagen, Hajnalka
    Kay, William
    Stevens, Bill
    Pereira, Mauricio
    Lean Construction Journal, 2020, 2020 : 42 - 77
  • [4] The Last Planner System as an Emergent Production Planning and Control Method: The Role of Multiple Representations
    Hamerski, Douglas Comassetto
    Saurin, Tarcisio Abreu
    Formoso, Carlos T.
    Isatto, Eduardo Luis
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (11)
  • [5] Experiences from the implementation of last planner system® in construction project
    Venkatesh, Prasad Kudrekodlu
    Venkatesan, Vasugi
    INDIAN JOURNAL OF ENGINEERING AND MATERIALS SCIENCES, 2021, 28 (02) : 125 - 141
  • [6] The Last-Planner-System's impact on project culture
    Luhr, Gunnar Jurgen
    Bosch-Rekveldt, Marian
    Radujkovie, Mladen
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2023, 21 (05) : 1303 - 1322
  • [7] From First Planner to Last Planner Applying a Capability Model to Measure the Maturity of the Planning Process in ETO
    Junge, Gabriele Hofinger
    Kjersem, Kristina
    Shlopak, Mikhail
    Alfnes, Erlend
    Halse, Lise Lillebrygfjeld
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE PRODUCTION MANAGEMENT TOWARDS SUSTAINABLE GROWTH (AMPS 2015), PT II, 2015, 460 : 240 - 247
  • [8] A survey on production planning system in construction projects based on Last Planner System
    Ha Duy Khanh
    Kim, Soo Yong
    KSCE JOURNAL OF CIVIL ENGINEERING, 2016, 20 (01) : 1 - 11
  • [9] A survey on production planning system in construction projects based on Last Planner System
    Ha Duy Khanh
    Soo Yong Kim
    KSCE Journal of Civil Engineering, 2016, 20 : 1 - 11
  • [10] Last Planner System Framework to Assess Planning Reliability in Architectural Design
    Shehab, Lynn
    Al Hattab, Malak
    Khalife, Salam
    El Samad, Ghali
    Abbas, Yara
    Hamzeh, Farook
    BUILDINGS, 2023, 13 (11)