Industrial data space application framework for semiconductor wafer manufacturing system scheduling

被引:0
|
作者
Chen, Da [1 ]
Zhang, Jie [2 ,4 ]
Wu, bd Lihui [3 ]
Zhang, Peng [2 ,4 ]
Wang, Ming [1 ]
机构
[1] Donghua Univ, Coll Mech Engn, Shanghai 201620, Peoples R China
[2] Donghua Univ, Inst Artificial Intelligence, Shanghai Engn Res Ctr Ind Big Data & Intelligent, Shanghai 201620, Peoples R China
[3] Shanghai Inst Technol, Sch Mech Engn, Shanghai 201418, Peoples R China
[4] Minist Educ, Engn Res Ctr Digitalized Text & Fash Technol, Shanghai, Peoples R China
基金
国家重点研发计划;
关键词
Industrial data space; Semiconductor wafer manufacturing system; Shop floor scheduling; Elemental correlation analysis; Knowledge learning; PERFORMANCE; MODEL;
D O I
10.1016/j.jmsy.2024.09.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The complex, large-scale semiconductor wafer manufacturing generates substantial diverse data, creating management hurdles and making efficient use of historical scheduling data difficult. To address these challenges, we propose a four-layer application framework for industrial data space for wafer manufacturing system (IDWFS). Firstly, a multi-level model ontology centred on scheduling tasks is constructed to effectively map the evolution of elemental relationships during wafer processing and adaptively change the data organisation. Then, a system architecture for mining the correlation between dynamic and static element data is proposed to fully explore the spatiotemporal correlation relationship of data elements in the processing process. Finally, a scheduling system architecture of "learning + prediction + scheduling"is proposed to fully utilise the scheduling historical domain knowledge and data correlation relationship in semiconductor wafer manufacturing system during the scheduling process. In addition, through three case studies related to the scheduling of semiconductor wafer manufacturing system, IDWFS is effective in heterogeneous data management, coupling relationship mining of element data, logistics scheduling processing, etc., thereby achieving logistics scheduling control of wafer manufacturing system.
引用
收藏
页码:464 / 482
页数:19
相关论文
共 50 条
  • [21] An integrated application framework for a cluster tool controller for semiconductor manufacturing
    Lee, TE
    Lee, JH
    ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2001, : 775 - 778
  • [22] Development of Wafer Warehouse Management System for Semiconductor Manufacturing Foundry Supply Chain
    YuChuan Liu Ming Cong Tainan University of TechnologyTaiWan Dalian University of TechnologyDaLian
    自动化博览, 2011, (S2) : 155 - 163
  • [23] Accuracy Analysis of Dynamic-Wafer-Handling Robotic System in Semiconductor Manufacturing
    Cheng, Hongtai
    Chen, Heping
    Mooring, Benjamin W.
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2014, 61 (03) : 1402 - 1410
  • [24] Simulation Study for Semiconductor Manufacturing System: Dispatching Policies for a Wafer Test Facility
    Yoon, Hyun Joong
    Chae, Junjae
    SUSTAINABILITY, 2019, 11 (04)
  • [25] Application of data computing for resource scheduling in manufacturing industries
    Brintha, N. C.
    Jappes, J. T. Winowlin
    Khan, M. Adam
    Christo, N. Johnny
    MATERIALS TODAY-PROCEEDINGS, 2021, 46 : 7251 - 7257
  • [26] Combined scheduling algorithm for re-entrant batch-processing machines in semiconductor wafer manufacturing
    Jia, Wenyou
    Jiang, Zhibin
    Li, You
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1866 - 1879
  • [27] A proposal of optimization methodology on manufacturing scheduling and its application into assembly production line in semiconductor manufacturing
    Kurose, Shinji
    Kaihara, Toshiya
    Fujii, Nobutada
    Nihon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2013, 79 (798): : 152 - 161
  • [28] A genetic scheduling methodology for virtual cellular manufacturing systems: an industrial application
    Mak, KL
    Lau, JSK
    Wang, XX
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2005, 43 (12) : 2423 - 2450
  • [29] Daily planning and scheduling system for the EDS process in a semiconductor manufacturing facility
    Lee, Young Hoon
    Ham, Myoungsoo
    Yoo, Bruce
    Lee, Jae Sun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (5-6): : 568 - 579
  • [30] Using a Multiagent Scheduling system for dedicated machine constraint in semiconductor manufacturing
    Liu, Alan
    Chen, Peter P.
    Shr, Arthur M. D.
    Yen-Ru Cheng
    2006 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-6, PROCEEDINGS, 2006, : 3262 - +