Calculation Model of Shield Tunnel Face Stability in Upper-Soft and Lower-Hard Strata

被引:0
|
作者
Liu, Quanwei [1 ]
Shao, Xiaokang [2 ]
Huang, Cheng [1 ]
Li, Chen [2 ]
Ye, Shoujie [1 ]
Jiang, Yusheng [2 ]
Yang, Zhiyong [2 ]
机构
[1] Qingdao Metro Line 6 Co., Ltd., Shandong, Qingdao,266100, China
[2] School of Mechanics and Civil Engineering, China University of Mining and Technology-Beijing, Beijing,100083, China
来源
关键词
20;
D O I
10.3969/j.issn.1001-4632.2024.04.12
中图分类号
学科分类号
摘要
引用
收藏
页码:111 / 119
相关论文
共 50 条
  • [31] Study on the Applicability of an Improved Pile-Beam-Arch Method of Metro Station Construction in the Upper-Soft and Lower-Hard Stratum
    Guo, Xinping
    Jiang, Annan
    Wang, Shanyong
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [32] Limit Equilibrium Models for Tunnel Face Stability in Composite Soft-Hard Strata
    Zhang, Xiao
    Song, Qilong
    Yao, Zhanhu
    Su, Dong
    Zhang, Yazhou
    Li, Qiang
    APPLIED SCIENCES-BASEL, 2023, 13 (19):
  • [33] Stability analysis of shield tunnel excavation face in upper-clay and lower-sand composite strata considering seepage
    Chen Liang
    Yingchao Wang
    Chuanxin Dong
    Peifeng Wu
    Zheng Zhang
    Jiawei Gu
    Bulletin of Engineering Geology and the Environment, 2025, 84 (2)
  • [34] Model tests on progressive collapse mechanism of a shallow subway tunnel in soft upper and hard lower composite strata
    Liu, Chang
    Zhang, Sulei
    Zhang, Dingli
    Zhang, Kunpeng
    Wang, Zhengzhong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 131
  • [35] Settlement Prediction of Double Line Shield Tunnel in Upper Soft and Lower Hard Stratas
    Chenglong Liu
    Zhenyong Wang
    Yusheng Jiang
    Soil Mechanics and Foundation Engineering, 2022, 59 : 385 - 393
  • [36] Settlement Prediction of Double Line Shield Tunnel in Upper Soft and Lower Hard Stratas
    Liu, Chenglong
    Wang, Zhenyong
    Jiang, Yusheng
    SOIL MECHANICS AND FOUNDATION ENGINEERING, 2022, 59 (04) : 385 - 393
  • [37] The deformation and mechanical properties of surrounding rock of primary support arch-cover construction method in upper-soft and lower-hard stratum
    Kong C.
    Gao X.
    Yao Y.
    Zhu X.
    Zhang J.
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2020, 39 : 2634 - 2644
  • [38] Study on adaptability of primary support arch cover method for large-span embedded tunnels in the upper-soft lower-hard stratum
    Wang, Junbao
    Huo, Qi
    Song, Zhanping
    Zhang, Yuwei
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (01)
  • [39] Upper bound analysis of longitudinally inclined EPB shield tunnel face stability in dense sand strata
    Cheng, Cheng
    Jia, Pengjiao
    Ni, Pengpeng
    Wang, Yingchao
    Zhao, Wen
    Guan, Yongping
    Lu, Bo
    TRANSPORTATION GEOTECHNICS, 2023, 41
  • [40] Theoretical analysis of the shield tunnel face stability in dry sandy strata
    Cheng, Cheng
    Chen, Yang
    Zhao, Chenyang
    Zhao, Wen
    Han, Jianyong
    Qi, Diyang
    Li, Tianliang
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2023, 27 (02) : 712 - 732