BIM implementation in project management practices for sustainable development: Partial Least square approach

被引:2
|
作者
Sajjad, Muhammad [1 ]
Hu, Anfeng [1 ]
Radu, Dorin [2 ]
Waqar, Ahsan [3 ]
Almujibah, Hamad R. [4 ]
Mateen, Abdul [5 ]
机构
[1] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Peoples R China
[2] Transylvania Univ Brasov, Fac Civil Engn, Turnului 5, Braov 500152, Romania
[3] Univ Lahore, Gujrat Campus,Jalalpur Jattan Rd, Gujrat 50700, Punjab, Pakistan
[4] Taif Univ, Coll Engn, Dept Civil Engn, Box 11099, Taif 21944, Saudi Arabia
[5] Int Islamic Univ, Dept Civil Engn, Islamabad 44000, Pakistan
关键词
BIM implementation; Project management; Pakistani construction industry; Success factors; INFORMATION MODELING BIM; BUILDINGS;
D O I
10.1016/j.asej.2024.103048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As an emerging area with far-reaching implications for project management practices, Despite the growing global adoption of Building Information Modelling (BIM), its implementation in the Pakistani construction sector faces significant challenges, particularly in relation to conflict and risk management, communication, and technical safety practices. The primary objective of this study is to identify and evaluate the key factors influencing BIM adoption in Pakistan, with a specific focus on understanding the roles of conflict and risk management, communication, technical safety management, and resource management in successful BIM implementation. The research used a combined pilot survey with 90 contributors, a prime questionnaire with 125 contributors, an exploratory factor analysis (EFA), and a structural equation modelling (SEM) approach has been used to do in depth statistical analysis. The results indicated the highest relation among planning and technical safety management and BIM implementation with path impact value of 0.613 followed by conflict and risk management with path value 272. According to the findings, every contributes appreciably to BIM's usefulness in construction and project management. This examination contributes to the development of BIM research.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Quality of Work Life and Turnover Intention: A Partial Least Square (PLS) Approach
    Surienty, Lilis
    Ramayah, T.
    Lo, May-Chiun
    Tarmizi, Azlin Natasha
    SOCIAL INDICATORS RESEARCH, 2014, 119 (01) : 405 - 420
  • [42] VALUATION OF GUARANTEED LIFE INSURANCE SURRENDER OPTION: A PARTIAL LEAST SQUARE APPROACH
    Zhang, Yingbin
    Bai, Manying
    Ruan, Yu
    ICIM2012: PROCEEDINGS OF THE ELEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2012, : 714 - 720
  • [43] Advantages and Implementation Steps of BIM-based Construction Project Management
    Li, Xiang
    Cao, Lei
    PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON ELECTRICAL & ELECTRONICS ENGINEERING AND COMPUTER SCIENCE (ICEEECS 2016), 2016, 50 : 441 - 444
  • [44] Project management regarded as a driver of sustainable development
    Ivanov, Igor
    Vlasova, Tatiana
    Orlova, Lyubov
    INNOVATIVE TECHNOLOGIES IN SCIENCE AND EDUCATION (ITSE-2020), 2020, 210
  • [45] BIM for sustainable project delivery: review paper and future development areas
    Ayman, Rana
    Alwan, Zaid
    McIntyre, Lesley
    ARCHITECTURAL SCIENCE REVIEW, 2020, 63 (01) : 15 - 33
  • [46] Application of the Cognitive Approach for IT Project Management and Implementation
    Chernova, Liubava
    Zhuravel, Anna
    Chernova, Lyudmila
    Chernov, Serhii
    Kunanets, Nataliia
    Artemenko, Olga
    2022 IEEE 17TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND INFORMATION TECHNOLOGIES (CSIT), 2022, : 426 - 429
  • [47] An Approach for Implementation of Project Management Information Systems
    Berzisa, Solvita
    Grabis, Janis
    INFORMATION SYSTEMS DEVELOPMENT: TOWARDS A SERVICE PROVISION SOCIETY, 2009, : 423 - 431
  • [48] Intranet Use for Management Accounting Systems in Hong Kong Public Hospitals: An Analysis Using Partial Least Square Approach
    Quaddus, Mohammed
    Fong, Steve Chun Cheong
    PACIFIC ASIA CONFERENCE ON INFORMATION SYSTEMS 2007, SECTIONS 1-6, 2007,
  • [49] Assessment of the Implementation of Sustainable Stormwater Management Practices in Asian Countries
    Seitzhan, Orynbayev
    Abdul Khadir, Fatin Khalida
    Bakyt, Smailov
    Ng, Cheng Yee
    Takaijudin, Husna
    Zawawi, Noor Amila Wan
    Alaloul, Wesam Salah
    Musarat, Muhammad Ali
    SUSTAINABILITY, 2023, 15 (21)
  • [50] Best practices of Building Information Modelling (BIM) implementation in design phase for construction project
    Kasim, N.
    Abidin, N. A. Zainal
    Zainal, R.
    Sarpin, N.
    Abd Rahim, M. H. I.
    Saikah, M.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271