Optimization Method for Installation Timing of Secondary Lining in Mechanized Tunnel Construction Using Drilling and Blasting Method

被引:0
|
作者
Chen, Zi-Quan [1 ]
Sun, Zhen-Yir [2 ]
Zhou, Zi-Han [1 ,3 ]
Li, Tian-Shcng [1 ]
Wang, Bo [1 ]
Xu, Guo-Wen [1 ]
Jiang, Chang-Wei [1 ]
机构
[1] Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Sichuan, Chengdu,610031, China
[2] Research Center of Tunneling and Underground Engineering, Ministry of Education, Beijing Jiaotong University, Beijing,100044, China
[3] Institute of Future Civil Engineering Science and Technology, Chongqing Jiaotong University, Chongqing,400074, China
基金
中国国家自然科学基金;
关键词
Blasting - Constitutive models - Construction equipment - Dynamic response - Dynamics - Elastoplasticity - Ground supports - Infill drilling - Linings - Rocks - Safety factor;
D O I
10.19721/j.cnki.1001-7372.2024.07.006
中图分类号
学科分类号
摘要
In recent years, China has vigorously advocated the construction of mechanized full-process tunnels using drilling and blasting methods. Although this modern construction mode of integrated mechanical equipment can effectively improve excavation efficiency, the overlong distance of mechanical equipment operation lines will seriously delay the timing of the secondary lining support, posing a threat to the stability of the surrounding rock support structure in weak and fractured rock layers. By investigating the relevant principles and control indicators for determining the timing of secondary lining support in tunnel design and construction specifications and sorting out the layout plan of the entire mechanized construction process, a dynamic optimization method for the timing of secondary lining support under the background of mechanized tunnel construction using the drilling and blasting method is proposed. This method integrates the elastic-plastic constitutive model of the surrounding rock, as well as the constitutive models of sprayed concrete, steel arch, anchor rod, and secondary lining. A complete history of the analytical method for the interaction between the surrounding rock and supporting structure is established to solve the bearing limit ratio and load sharing ratio. Finally, the distribution law of the safety factor of the surrounding rock was calculated and analyzed. The results indicate that the effectiveness of the proposed dynamic optimization method for the timing of secondary lining support in mechanized construction has been verified through case analysis: Different reinforced initial support schemes corresponding to a distance of 80 to 120 m for the deployment of mechanical equipment operation lines (the latest support time for secondary lining), and the secondary lining can share 7% to 13% of the surrounding rock load; the overall safety factors of the surrounding rock under the initial support scheme corresponding to the arrangement distances of 80, 100, and 120 m mechanical equipment operation lines are 1.19, 1.30, and 1.26, respectively, which meet the safety control benchmark. © 2024 Chang'an University. All rights reserved.
引用
收藏
页码:70 / 81
相关论文
共 50 条
  • [31] Construction of a large-section tunnel adjacent to an existing tunnel by new pre-lining support method
    Fujishita, K
    Motomura, H
    Otsu, T
    Terauchi, S
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 685 - 690
  • [32] Optimization Design Method of Mountain Tunnel Lining Based on Stress Mapping Return Arithmetic
    Niu, Zelin
    Song, Zhanping
    EDUCATION MANAGEMENT, EDUCATION THEORY AND EDUCATION APPLICATION, 2011, 109 : 729 - +
  • [33] Optimization of manufacturing parameters for a brake lining using Taguchi method
    Kim, SJ
    Kim, KS
    Jang, H
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2003, 136 (1-3) : 202 - 208
  • [34] Optimization of CFRP Drilling Conditions Using the Taguchi Method
    Jeong, Ho-In
    Lee, Choon-Man
    Kim, Dong-Hyeon
    TRANSACTIONS OF THE KOREAN SOCIETY OF MECHANICAL ENGINEERS A, 2021, 45 (12) : 1077 - 1083
  • [35] Analytical Method for Segmental Tunnel Linings Reinforced by Secondary Lining Considering Interfacial Slippage and Detachment
    Zhang, X. D.
    Wang, J. C.
    Chen, Q. J.
    Lin, Z. J.
    Gong, X. N.
    Yang, Z. X.
    Xu, R. Q.
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2021, 21 (06)
  • [36] Study on bearing mechanism and stress calculation method of tunnel secondary lining of fiber reinforced concrete
    Cui, Guangyao
    Zuo, Kuixian
    Zhu, Changan
    Zhang, Guoqiang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2018, 51 (10): : 122 - 128
  • [37] Analysis of the Stability of the Double-Hole Complementary Ventilation and Ventilation Network of the Tunnel Constructed by Drilling and Blasting Method
    Deng, Huan
    Chen, Shiqiang
    Rao, Ying
    APPLIED SCIENCES-BASEL, 2024, 14 (05):
  • [38] Study on dust distribution in a highway tunnel during the full-face excavation with Drilling-Blasting method
    Guo, Yin
    Wang, Yingchao
    Geng, Fan
    Zhang, Zheng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2023, 139
  • [39] Evaluation of possibility of tunnel collapse by drilling and blasting method based on T-S fuzzy fault tree
    Chen Wu
    Zhang Guo-hua
    Wang Hao
    Zhong Guo-qiang
    Wang Cheng-tang
    ROCK AND SOIL MECHANICS, 2019, 40 : 319 - 328
  • [40] The optimization of a rail induction heating installation using the simplex method
    Taraş, P. (petrica_taras@amotion.pub.ro), 2012, Splaiul Independentei 313 - Sector 6, Bucharest, 77206, Romania (74):