A method to balancing robotic mixed-model assembly lines: Practical constraints, computational challenges, and performance estimation

被引:0
|
作者
Schibelbain, Daniel [1 ]
Lopes, Thiago Cantos [1 ]
Magatao, Leandro [1 ]
机构
[1] Fed Univ Technol Parana UTFPR, Grad Program Elect & Comp Engn CPGEI, Curitiba, Brazil
关键词
Robotic mixed-model assembly line balancing; problem (RMALBP); Mixed-integer linear programming (MILP); Performance simulation; Real-world case study; MATHEMATICAL-MODEL; SEQUENCING PROBLEM; ALGORITHM; METAHEURISTICS; CLASSIFICATION; OPTIMIZATION; DESIGN; ORDER;
D O I
10.1016/j.cie.2024.110595
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers a robotic assembly line with various practical constraints. These have been previously modeled mathematically, but extending it to consider mixed-model production presents two challenges: computational costs increase substantially with problem size, and devising a theoretical model for practical performance is difficult within mathematical programming. This paper seeks to bridge those gaps,by proposing a method based on fixing, constraining, and optimizing mixed-integer programming instances. Simulations and linear relaxations are used to measure performance and estimate room for improvement. The resulting solution for the large-size industrial case study reached approximately 5% better throughput than a mixed- model benchmark approach, which represents around 85% of the estimated improvement potential for starting from that initial solution. Furthermore, an exhaustive set of tests was performed to demonstrate the proposed method's efficacy. Hence, the method managed to optimize a rather challenging computational problem that combines the complexity of relevant practical constraints with theoretical difficulties in estimating the performance of solutions.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] Sequencing mixed-model assembly lines to level parts usage with consideration of line balancing
    Song, HM
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 1655 - 1659
  • [32] Dynamic resequencing at mixed-model assembly lines
    Franz, Christian
    Koberstein, Achim
    Suhl, Leena
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) : 3433 - 3447
  • [33] A dynamic part supply method for automated mixed-model assembly lines
    Dong, Jietao
    Zhang, Linxuan
    Xiao, Tianyuan
    Li, Hui
    PROCEEDINGS OF THE 2015 IEEE 19TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN (CSCWD), 2015, : 523 - 527
  • [34] A sequencing algorithm for mixed-model assembly lines
    Tokyo Metropolitan University
    J. Jpn Ind. Manage. Assoc., 2007, 4 (257-266):
  • [35] Part Supply Method for Mixed-Model Assembly Lines with Decentralized Supermarkets
    Dong, Jietao
    Zhang, Linxuan
    Xiao, Tianyuan
    TSINGHUA SCIENCE AND TECHNOLOGY, 2016, 21 (04) : 426 - 434
  • [36] Part Supply Method for Mixed-Model Assembly Lines with Decentralized Supermarkets
    Jietao Dong
    Linxuan Zhang
    Tianyuan Xiao
    TsinghuaScienceandTechnology, 2016, 21 (04) : 426 - 434
  • [37] Development of search method for sequencing problem in mixed-model assembly lines
    Ishigaki, Aya
    Miyashita, Tomoyuki
    JOURNAL OF ADVANCED MECHANICAL DESIGN SYSTEMS AND MANUFACTURING, 2016, 10 (03):
  • [38] A RESOURCE BASED MODEL FOR MIXED-MODEL ASSEMBLY LINE BALANCING
    Genikomsakis, K. N.
    Tourassis, V. D.
    MANAGEMENT OF TECHNOLOGICAL CHANGES, VOL 1, 2009, : 493 - 496
  • [39] Balancing a Mixed-Model Assembly System in the Footwear Industry
    Sadeghi, Parisa
    Rebelo, Rui Diogo
    Ferreira, Jose Soeiro
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: THE PATH TO INTELLIGENT, COLLABORATIVE AND SUSTAINABLE MANUFACTURING, 2017, 513 : 527 - 535
  • [40] Balancing of robotic mixed-model two-sided assembly line with robot setup times
    Mojtaba Aghajani
    Reza Ghodsi
    Babak Javadi
    The International Journal of Advanced Manufacturing Technology, 2014, 74 : 1005 - 1016