Integration of strategic open-pit mine planning into hierarchical artificial intelligence

被引:1
|
作者
Quelopana A. [1 ]
Navarra A. [2 ]
机构
[1] Department of Systems and Computer Engineering, Universidad Católica Del Norte, Antofagasta
[2] Department of Mining and Materials Engineering, McGill University, Montreal
关键词
Artificial intelligence; Machine learning; Metaheuristics; Open-pit strategic mine planning; Q-learning; Variable neighbourhood descent;
D O I
10.17159/2411-9717/1367/2021
中图分类号
学科分类号
摘要
The mine production scheduling problem (MPSP) has been studied since the 1960s, and remains an active area of computational research. In extending the concepts of the MPSP, the automated mine may now be regarded as a hierarchical intelligent agent in which the bottom layer consists of distributed robotic equipment, while strategic functionality occupies the higher layers. Here we present a disambiguation of artificial intelligence, machine learning, computational optimization, and automation within the mining context. Specifically, the Q-learning algorithm has been adapted to generate the initial solutions for a high-performing strategic mine planning algorithm, originally developed by Lamghari, Dimitrakopoulos and Ferland, based on the variable neighbourhood descent (VND) metaheuristic. The hierarchical intelligent agent is presented as an integrative conceptual platform, defining the interaction between our new Q-learning adaptation and Lamghari's VND, and potentially other hierarchically controlled components of an artificially intelligent mine, having various degrees of automation. Sample computations involving Q-learning and VND are presented. © 2021 South African Institute of Mining and Metallurgy. All rights reserved.
引用
收藏
页码:643 / 652
页数:9
相关论文
共 50 条
  • [31] Block size selection and its impact on open-pit design and mine planning
    Jara, RM
    Couble, A
    Emery, X
    Magri, EJ
    Ortiz, JM
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (03): : 205 - 211
  • [32] SUWANNEE RIVER IS SAFEST OPEN-PIT MINE
    不详
    AMERICAN MINING CONGRESS JOURNAL, 1983, 69 (01): : 10 - 10
  • [33] Rock bolting at the Flambeau open-pit mine
    Yost, R
    E&MJ-ENGINEERING AND MINING JOURNAL, 1997, 198 (09): : 58 - 62
  • [34] MODELING AN OPEN-PIT MINE IN A MULTITEST STATEMENT
    NAZAROV, IV
    KORTELEV, OB
    JOURNAL OF MINING SCIENCE, 1993, 29 (05) : 434 - 439
  • [35] A STUDY OF RADIATION PARAMETERS IN AN OPEN-PIT MINE
    LEACH, VA
    LOKAN, KH
    MARTIN, LJ
    HEALTH PHYSICS, 1982, 43 (03): : 363 - 375
  • [36] Scheduling of open-pit phosphate mine extraction
    Azzamouri, Ahlam
    Fenies, Pierre
    Fontane, Frederic
    Giard, Vincent
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (23) : 7122 - 7141
  • [37] CUTOFFS GRADE CALCULATIONS FOR AN OPEN-PIT MINE
    JOHN, HT
    CIM BULLETIN, 1985, 78 (879): : 73 - 75
  • [38] Optimized Transportation of the Open-pit Coal Mine
    Cai B.
    Hao J.
    Zhu H.
    Chen H.
    Journal of Engineering Science and Technology Review, 2022, 15 (04) : 90 - 95
  • [39] OPEN-PIT MINE DESIGN IN SEISMIC AREAS
    DEVALLEJO, LG
    ELDRED, PJL
    OTEO, CS
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1984, 93 (OCT): : A192 - A197
  • [40] Buckling failure at an open-pit coal mine
    Aydan, O
    Ulusay, R
    Kumsar, H
    Ersen, A
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 641 - 648