共 48 条
- [1] AP1000 Operation Procedures System and Development PROCEEDINGS OF THE 18TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING 2010, VOL 1, 2011, : 103 - 108
- [2] Optimization design and test research of AP1000 nuclear reactor coolant pump Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2015, 49 (09): : 1648 - 1654
- [3] ROBUSTNESS OF THE MSHIM OPERATION AND CONTROL STRATEGY IN THE AP1000 DESIGN ICONE 17: PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, VOL 3, 2009, : 893 - 904
- [4] Lifting Operation Safety Management in AP1000 Nuclear Plant Project PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,
- [5] A Brief Introduction of Design Optimization for AP1000 Condensation Return Hedongli Gongcheng/Nuclear Power Engineering, 2020, 41 (05): : 79 - 83
- [7] Research on AP1000 plant with RELAP5 program Bi, Jin-Sheng, 1600, Sila Science, University Mah Mekan Sok, No 24, Trabzon, Turkey (32):
- [8] First Westinghouse AP1000 plant sanmen 1 begins commercial operation ATW-INTERNATIONAL JOURNAL FOR NUCLEAR POWER, 2018, 63 (11-12): : 623 - 624
- [9] RESEARCH OF LIQUID ENTRAINMENT THROUGH ADS-4 IN AP1000 PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 2A, 2014,
- [10] RESEARCH ON PROJECT MANAGEMENT OF DCS DEVELOPMENT FOR FIRST AP1000 UNIT PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 5, 2014,