Optimization design and test research of AP1000 nuclear reactor coolant pump

被引:0
|
作者
Fu, Qiang [1 ]
Xi, Yi [1 ]
Zhu, Rong-Sheng [1 ]
Wang, Xiu-Li [1 ]
机构
[1] Research Center of Fluid Machinery Engineering and Technology, Jiangsu University, Zhenjiang,212013, China
关键词
D O I
10.7538/yzk.2015.49.09.1648
中图分类号
学科分类号
摘要
引用
收藏
页码:1648 / 1654
相关论文
共 50 条
  • [1] Evaluation of service reliability of AP1000 nuclear reactor coolant pump rotor-can
    Cui, Yan
    Zhang, Chi
    Zhang, Liwen
    Song, Kangjie
    ANNALS OF NUCLEAR ENERGY, 2022, 172
  • [2] Impact Of Diffuser Width On The Performance Of AP1000 Reactor Coolant Pump
    Yuan, Danqing
    Yan, Hua
    Wang, Peipei
    ELECTRICAL POWER & ENERGY SYSTEMS, PTS 1 AND 2, 2012, 516-517 : 921 - 925
  • [3] Casting process design and practice for coolant pump impeller in AP1000 nuclear power station
    Ping Zhao
    Zhongli Liu
    Guiquan Wang
    Peng Liu
    ChinaFoundry, 2020, 17 (02) : 173 - 177
  • [4] Casting process design and practice for coolant pump impeller in AP1000 nuclear power station
    Ping Zhao
    Zhong-li Liu
    Gui-quan Wang
    Peng Liu
    China Foundry, 2020, (02) : 173 - 177
  • [5] Casting process design and practice for coolant pump impeller in AP1000 nuclear power station
    Zhao, Ping
    Liu, Zhong-li
    Wang, Gui-quan
    Liu, Peng
    CHINA FOUNDRY, 2020, 17 (02) : 173 - 177
  • [6] Casting process design and practice for coolant pump impeller in AP1000 nuclear power station
    Ping Zhao
    Zhong-li Liu
    Gui-quan Wang
    Peng Liu
    China Foundry, 2020, 17 : 173 - 177
  • [7] Design and Research of Drilling and Draining Equipment for Canopy Seal Weld on CAP1400/AP1000 Canned Reactor Coolant Pump
    Yan G.
    Wen Z.
    Li W.
    Yu Z.
    Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (04): : 145 - 148
  • [8] Development of In-Service Inspection System for Flange Bolts of Reactor Coolant Pump in AP1000 Nuclear Power Plant
    Zhou L.
    Wang L.
    Liu Y.
    Chen J.
    Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (04): : 162 - 167
  • [9] The AP1000 reactor - the nuclear renaissance option
    Matzie, RA
    Worrall, A
    NUCLEAR ENERGY-JOURNAL OF THE BRITISH NUCLEAR ENERGY SOCIETY, 2004, 43 (01): : 33 - 45
  • [10] Root Cause Analysis of In-Situ AP1000 Reactor Coolant Pump Lock Cup Failure
    Fan F.
    Lu Z.
    Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 (04): : 176 - 181