共 50 条
- [21] A handy objective model for estimation of spontaneous fire risk potential of underground panels in bord and pillar method of mining MINE ENVIRONMENT AND VENTILATION, 2001, : 491 - 497
- [22] FAUX CEILING AT UNDERGROUND MINING AS AN ALTERNATIVE TO ORE PILLAR BULLETIN OF THE TOMSK POLYTECHNIC UNIVERSITY-GEO ASSETS ENGINEERING, 2016, 327 (03): : 87 - 94
- [23] Pillar deformation response delay effect in underground mining ENVIRONMENTAL AND SAFETY CONCERNS IN UNDERGROUND CONSTRUCTION, VOLS, 1 AND 2, 1997, : 751 - 756
- [24] Bord and pillar applications on the platinum mine: T-cut mining method JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2005, 105 (03): : 187 - 191
- [25] BORD AND PILLAR MINING IN INDIA - WHERE DO WE GO FROM HERE? Journal of Mines, Metals and Fuels, 1985, 33 (9-10): : 403 - 411
- [26] Improving Utilization of Face Rigs in Bord and Pillar Mining: A Zimbabwean Case Study Proceedings of the 24th International Mining Congress and Exhibition of Turkey, IMCET 2015, 2015, : 514 - 523
- [27] Characterization of coal mine panels in bord and pillar workings in respect of their proneness to spontaneous heating - a prediction model JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2003, 103 (09): : 563 - 571
- [28] Evaluation and re-dimensioning of room and pillar workings in an underground gypsum mine ROCK MECHANICS IN THE NATIONAL INTEREST, VOLS 1 AND 2, 2001, : 337 - 342
- [29] Strata Control by Roof Blasting for Bord and Pillar Mining Method in Mechanized Depillaring Panels APPLIED SCIENCES-BASEL, 2025, 15 (03):
- [30] Room and Pillar Design and Construction for Underground Coal Mining in Greece Geotechnical and Geological Engineering, 2019, 37 : 1729 - 1742