Risks and challenges affecting opencast pillar mining in previously mined underground bord and pillar workings

被引:1
|
作者
Ngwenyama P.L. [1 ]
De Graaf W.W. [1 ]
机构
[1] Department of Mining Engineering, University of Pretoria
关键词
Bord and pillar collapse; Bord collapse; Bord voids; Opencast pillar mining; Sinkholes; Spontaneous combustion;
D O I
10.17159/2411-9717/1675/2021
中图分类号
学科分类号
摘要
South Africa is one of the leading producers and exporters of coal globally. A significant amount of the country's production is obtained from previously mined underground bord and pillar workings. This coal is in the form of pillars and remnants on the roof and floor of the old workings. The good quality coal pillars were left behind as primary support during underground bord and pillar mining operations. Due to the depletion of virgin coal reserves, the pillars and remnant coal are now removed using opencast mining rather than underground methods. However, the secondary extraction of pillars and remnant coal from the old workings using opencast methods entails some serious challenges that have a negative impact on the safety and productivity of the operations, affecting both personnel and machinery. If these risk factors and challenges are managed properly, then the opencast mining operations could remove the pillars safely at recoveries competitive with those of virgin coal operations. In this study we review the recurring challenges affecting opencast pillar mining by means of field investigations and consultations with experts at five opencast pillar mining operations, and evaluate the best practices used to combat these challenges. It was found that each mine has its own unique conditions and challenges. © 2021 South African Institute of Mining and Metallurgy. All rights reserved.
引用
收藏
页码:623 / 633
页数:10
相关论文
共 50 条
  • [1] Fender design in bord and pillar workings
    Ram, Angad
    Singh, T.N.
    Journal of Mines, Metals and Fuels, 1988, 36 (12): : 533 - 538
  • [2] A METHOD OF DESIGNING BORD AND PILLAR WORKINGS
    SALAMON, MDG
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1967, 68 (02): : 68 - &
  • [3] A METHOD OF DESIGNING BORD AND PILLAR WORKINGS
    SALAMON, MDG
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1994, 94 (03): : 135 - 140
  • [4] Factors and challenges affecting coal recovery by opencast pillar mining in the Witbank coalfield
    Ngwenyama, P. L.
    de Graaf, W. W.
    Preis, E. P.
    JOURNAL OF THE SOUTHERN AFRICAN INSTITUTE OF MINING AND METALLURGY, 2017, 117 (03) : 215 - 222
  • [5] Life and design of bord-and-pillar workings affected by pillar scaling
    Salamon, MDG
    Ozbay, MU
    Madden, BJ
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1998, 98 (03): : 135 - 145
  • [6] THE OPENCAST MINING OF PREVIOUSLY UNDERGROUND-MINED COAL SEAMS
    CLOUGH, WD
    MORRIS, R
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1985, 85 (12): : 435 - 439
  • [7] IMPROVEMENT IN PRODUCTIVITY IN BORD & PILLAR WORKINGS - EXPERIENCE IN ECL.
    Singh, S.N.
    1600, (34):
  • [8] Effects on surface structures due to collapsed bord and pillar workings
    Madden, BJ
    vanderMerwe, JN
    Oldroyd, DC
    EUROCK '96/TORINO/ITALY - PREDICTION AND PERFORMANCE IN ROCK MECHANICS AND ROCK ENGINEERING, PROCEEDINGS, VOLS 1 AND 2, 1996, : 1283 - 1290
  • [9] THE DEVELOPMENT AND APPLICATION OF STRIP-MINING TO PREVIOUSLY MINED UNDERGROUND COAL WORKINGS
    LAYBOURNE, RA
    WATTS, R
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1990, 90 (08): : 187 - 197
  • [10] Bord-and-pillar mining in inclined orebodies
    Jordaan, JT
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2003, 103 (02): : 101 - 110