Research on the Longitudinal Stiffness of Pier and Temperature Span of High-speed Railway Integral Bridge

被引:0
|
作者
Dai, Gonglian [1 ]
Chen, Yanjie [1 ]
Dang, Kan [1 ]
Wang, Dezhi [2 ]
机构
[1] Central South University, Changsha,410075, China
[2] China Railway Siyuan Survey and Design Group Co. Ltd, Wuhan,430063, China
关键词
Calculation formula - Design parameters - Gap widths - High-speed railways - Integral bridges - Internal bridge - Longitudinal stiffness - Longitudinal stiffness of pier - Relative displacement - Temperature span;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: The beam-rail interaction is closely related to the value of the design parameters of the high-speed railway internal bridge such as span layout and pier stiffness. When the values are not reasonable, the problems such as excessive deformation, instability and fracture of the rail on the bridge will occur. To ensure the safety of the lines on the bridge and obtain the value range and related relationship of the design parameters, this paper simulates the resistance of beam and rail based on the double-line and multi-segment broken lines, and establishes an equilibrium equation of the CWR to obtain the parameters like the additional stress and displacement of the rail. Combining rail strength, the relative displacement of beam and rail, displacement of pier top, rail gap width and rail stability, respectively, the relationship between the bridge temperature span and the piers' longitudinal stiffness and the value range are determined. Research conclusions:(1) The temperature span and the piers' longitudinal stiffness are mainly affected by the rail strength constraint. The relative displacement of beam and rail, the displacement of the pier top, the rail gap width constraint and the stability of the rail have little influence. (2) The relevant calculation formulas for the two parameters of temperature span and piers' longitudinal stiffness under the limit of the code are put forward. (3) The algorithms and calculation formulas can provide a certain reference for the design of integral bridges. © 2022, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
页码:31 / 37
相关论文
共 50 条
  • [31] Developments and Prospects of Long-Span High-Speed Railway Bridge Technologies in China
    Qin, Shunquan
    Gao, Zongyu
    ENGINEERING, 2017, 3 (06) : 787 - 794
  • [32] Train-bridge interaction effects on the dynamic response of a small span high-speed railway bridge
    Rocha, J.
    Henriques, A. A.
    Calcada, R.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1718 - 1725
  • [33] Dongping Channel Bridge: Long-Span Steel Arch Bridge in High-Speed Railway, China
    Liu, Wenshuo
    Dai, Gonglian
    STRUCTURAL ENGINEERING INTERNATIONAL, 2011, 21 (04) : 492 - 496
  • [34] Track-Bridge Interaction of CWR on Chinese Large-Span Bridge of High-Speed Railway
    Yan, Bin
    Kuang, Wenfei
    Gan, Rui
    Xie, Haoran
    Huang, Jie
    APPLIED SCIENCES-BASEL, 2022, 12 (18):
  • [35] The Minimum Longitudinal Horizontal Linear-stiffness of Piers of Typical High-speed Railway's Layout of Turnout and Bridge
    Liu, Zhe
    Wang, Ping
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3979 - 3983
  • [36] CWR longitudinal force of cable-stayed bridge of High-speed Railway
    Yan, Bin
    Dai, Gong-Lian
    Tiedao Xuebao/Journal of the China Railway Society, 2012, 34 (03): : 83 - 87
  • [37] Research on protective measures for highway bridge crossing high-speed railway
    Li, Ji-Lin
    Sun, Zong-Lei
    Liu, Hong-Zhan
    Journal of Railway Engineering Society, 2013, 30 (05) : 52 - 56
  • [38] Longitudinal forces characteristic of Bogl longitudinal connected ballastless track on high-speed railway bridge
    Xu, Qing-Yuan
    Zhang, Xu-Jiu
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2009, 40 (02): : 526 - 532
  • [39] Analysis and design of hybrid frame pier for high-speed railway
    Hu, N.
    Dai, G. L.
    STRUCTURES AND ARCHITECTURE, 2010, : 1408 - 1416
  • [40] A Settlement Curve Prediction Method of High-speed Railway Bridge Pier Based on RLM-MC
    Gong X.
    Wang H.
    Lu T.
    You W.
    Tiedao Xuebao/Journal of the China Railway Society, 2022, 44 (10): : 142 - 149