Establishing variability for hot-mix asphalt construction in Arkansas

被引:0
|
作者
Hall, Kevin D. [1 ]
Williams, Stacy G. [2 ]
机构
[1] Department of Civil Engineering, University of Arkansas, 4190 Bell Engineering Center, Fayetteville, AR 72701, United States
[2] Department of Civil Engineering, University of Arkansas, 700 West Research Center Boulevard, Fayetteville, AR 72701, United States
关键词
Aggregates - Binders - Mechanical testing - Quality assurance - Quality control - Road construction - Specifications - Statistical methods;
D O I
10.3141/1813-21
中图分类号
学科分类号
摘要
The Arkansas quality control/quality assurance (QC/QA) specification for hot-mix asphalt (HMA) construction was initially developed from data and experience gained with the Marshall method of mix design. The implementation of Superpave®, coupled with the initiation of the largest asphalt construction program in the state's history, resulted in questions relating to the suitability of the QC/QA specification. Research was undertaken to revise the existing program or create a new specification. The first step in the effort was to establish typical HMA construction variability in terms of the pay factors used in Arkansas: air voids, voids in the mineral aggregate, binder content, and field density. Six projects were randomly sampled and tested by three operators: the contractor, the agency, and the research team. Six specimens were prepared by each operator at each of four testing times within each project. The results of the testing showed that the six projects bracketed a wide variation in mixture quality as defined by the HMA properties. The testing data were normally distributed, validating a typical assumption regarding construction. Analyses showed that the testing variability among the three operators could be absorbed into the overall variability of test properties instead of being considered a distinct factor. Three levels of HMA quality were identified by the mean and standard deviation of the test data. These quality levels are expected to form the basis for any revision to the existing QC/QA system or for the development of a new QC/QA system for Arkansas HMA construction.
引用
下载
收藏
页码:172 / 180
相关论文
共 50 条
  • [41] Ground Penetrating Radar as a Quality Assurance Tool in Hot-Mix Asphalt Road Construction
    Wilson, Bryan
    Devadast, Arvind
    Lytton, Robert
    Sebesta, Stephen
    MATERIALS EVALUATION, 2020, 78 (10) : 1129 - 1139
  • [42] Towards a mix design model for the prediction of permeability of hot-mix asphalt
    Blaauw, Sheldon A.
    Maina, James W.
    Horak, Emile
    CONSTRUCTION AND BUILDING MATERIALS, 2019, 221 : 637 - 642
  • [43] HOT-MIX ASPHALT COMPACTION EVALUATION WITH FIELD TESTS
    Micaelo, Rui
    Azevedo, Maria C.
    Ribeiro, Jaime
    BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2014, 9 (04): : 306 - 316
  • [44] Study on the microstructure and properties of hot-mix epoxy asphalt
    Zeng G.
    Xu W.
    Huang H.
    Zhang X.
    International Journal of Pavement Research and Technology, 2019, 12 (02): : 147 - 153
  • [45] Simulation of fracture initiation in hot-mix asphalt mixtures
    Birgisson, B
    Soranakom, C
    Napier, JAL
    Roque, R
    SOIL MECHANICS 2003: SOILS, GEOLOGY, AND FOUNDATIONS, 2003, (1849): : 183 - 190
  • [46] How the Mix Factors Affect the Dynamic Modulus of Hot-Mix Asphalt
    Islam, Md Rashadul
    Kalevela, Sylvester A.
    Mendel, Guy
    JOURNAL OF COMPOSITES SCIENCE, 2019, 3 (03):
  • [47] Slippage Failure of a New Hot-Mix Asphalt Overlay
    Chen, Dar-Hao
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2010, 24 (03) : 258 - 264
  • [48] Statistics for superpave hot-mix asphalt construction quality, control/quality assurance data
    Parker, F
    Hossain, MS
    CONSTRUCTION 2002: MATERIALS AND CONSTRUCTION, 2002, (1813): : 151 - 156
  • [49] Hot-mix asphalt mixtures for Nevada's intersections
    Hajj, Elie Y.
    Siddharthan, Raj V.
    Sebaaly, Peter E.
    Weitzel, Dean
    TRANSPORTATION RESEARCH RECORD, 2007, 2001 (2001) : 73 - 83
  • [50] Summary of current quality control/quality assurance practices for hot-mix asphalt construction
    Schmitt, RL
    Russell, JS
    Hanna, AS
    Bahia, HU
    Jung, GA
    CONSTRUCTION QUALITY AND MANAGEMENT, 1998, (1632): : 22 - 31