Toward optimal updating time inspection based on reliability Approach of fatigue crack propagation

被引:2
|
作者
Eltaief, M. [1 ,5 ]
Hassine, T. [2 ,5 ]
Bouraoui, C.H. [3 ,5 ]
Riahi, H. [2 ,4 ,5 ]
Chateauneuf, A. [4 ]
Bressolette, P.H. [4 ]
机构
[1] Institue Supérieur des Etudes Technologique de Sousse, Sousse University, Tunisia
[2] Ecole Nationale D'Ingénieurs de Monastir, Monastir University, Tunisia
[3] Institut Supérieur des Systèmes Industriels du Gabès, Gabes University, Tunisia
[4] Poly Tech Clermont Ferrant Université Blaise Pascal, EA 3867, 0448, 63000 Clermont-Fd, France
[5] Laboratoire de Génie Mécanique, Université de Monastir, Ecole Nationale D'Ingénieurs de Monastir, Avenue Ibn El Jazzar, 5019 Monastir, Tunisia
关键词
Bayesian networks - Geometry - Reliability analysis - Inspection;
D O I
10.4028/www.scientific.net/AMM.146.96
中图分类号
学科分类号
摘要
It is well-established that fatigue crack growth process is one of the main process which can produce failure of structures and mechanical components. The aim of this work is to develop a model predicting an updating inspection time model for structural fatigue crack growth life based on updating reliability analysis taking into account the additional information generated by the previous inspection results. First order reliability method (FORM) and Surface response method are used to evaluate the reliability. The uncertainties such as material parameters and geometrical parameters which affect the lifespan of the structure were regarded as random variables. Updating reliability assessment based on Bayesian approach was introduced to determine the updating inspection time for target reliability. The method was illustrated through an application to a plate with an emergent rectilinear crack loaded with a constant amplitude cyclic stress. The results of the application are in a good agreement with the physical results and show that the proposed method is proved to be feasible and applicable in the general complex fatigue loading and able to give accurate updating framework for scheduling inspections. Furthermore the proposed approach leads to determine the optimal Inspection time strategy based upon cost-minimization by considering a single type or multiple types of inspections. © (2012) Trans Tech Publications, Switzerland.
引用
收藏
页码:96 / 111
相关论文
共 50 条
  • [31] Prediction of optimal inspection time for structural fatigue life
    Meng, Guangwei
    Li, Feng
    Sha, Lirong
    Zhou, Zhenping
    INTERNATIONAL JOURNAL OF FATIGUE, 2007, 29 (08) : 1516 - 1522
  • [32] Research on fatigue crack propagation behavior and reliability evaluation of steel bridge
    Li, Junting
    Su, Sanqing
    Wang, Wei
    JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH, 2025, 228
  • [33] Effect of results of fatigue crack propagation tests on the reliability of lifetime assessment
    Lukács, J
    FATIGUE '99: PROCEEDINGS OF THE SEVENTH INTERNATIONAL FATIGUE CONGRESS, VOLS 1-4, 1999, : 2717 - 2722
  • [34] Optimal inspection scheduling with alternative fatigue reliability formulations for steel bridges
    Chung, HY
    Manuel, L
    Frank, KH
    APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, VOLS 1 AND 2, 2003, : 1079 - 1086
  • [35] LOCAL CRACK-TIP STRAIN APPROACH TO FATIGUE CRACK-PROPAGATION
    FURUYA, Y
    SHIMADA, H
    ENGINEERING FRACTURE MECHANICS, 1987, 26 (03) : 349 - 356
  • [36] Cost-based optimal history-dependent inspection strategy for random fatigue crack growth
    Toyoda-Makino, M
    PROBABILISTIC ENGINEERING MECHANICS, 1999, 14 (04) : 339 - 347
  • [37] Nondestructive inspection of fatigue crack propagation beneath supersonic particle deposition coatings during fatigue testing
    Ibrahim, Matthew E.
    Zhuang, Wyman Z. L.
    INTERNATIONAL JOURNAL OF FATIGUE, 2017, 102 : 149 - 157
  • [38] Inspection scheduling based on reliability updating of gas turbine welded structures
    Coro, Armando
    Abasolo, Mikel
    Aguirrebeitia, Josu
    Lopez de Lacalle, L. N.
    ADVANCES IN MECHANICAL ENGINEERING, 2019, 11 (01)
  • [39] Fatigue crack propagation model based on crack tip damage zone
    Jixie Kexue Yu Jishu, 5 (701-703, 724):
  • [40] Analysis of the Fatigue Crack Propagation Process of the Stress-Absorption Layer of Composite Pavement Based on Reliability
    Sun, Yazhen
    Yan, Ting
    Wu, Changyu
    Sun, Xiaofang
    Wang, Jinchang
    Yuan, Xuezhong
    APPLIED SCIENCES-BASEL, 2018, 8 (11):