Performance of trenchless techniques for sewer construction in Hong Kong

被引:0
|
作者
Mok, Wilson W.S. [1 ]
机构
[1] Binnie Black and Veatch Hong Kong, Hong Kong, Hong Kong
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Sewer tunnels
引用
收藏
页码:51 / 56
相关论文
共 50 条
  • [42] Landslides at active construction sites in Hong Kong
    Lau, T. M. F.
    Sun, H. W.
    Tsui, H. M.
    Ho, K. K. S.
    LANDSLIDES AND ENGINEERED SLOPES: FROM THE PAST TO THE FUTURE, VOLS 1 AND 2, 2008, : 1581 - +
  • [43] Hong Kong Western Harbour Crossing construction
    Ogura, K
    Hatakeyama, K
    Aikawa, F
    IMMERSED TUNNEL TECHNIQUES 2, 1997, : 292 - 300
  • [44] Timber construction of vernacular buildings in Hong Kong
    Ho, P. P.
    Structural Studies, Repairs and Maintenance of Heritage Architecture X, 2007, 95 : 167 - 175
  • [45] Partnering in construction industry: Hong Kong context
    Wong, A
    TOTAL QUALITY MANAGEMENT, 1997, 8 (2-3): : S324 - S327
  • [46] Trenchless sewer rehabilitation - a customer's perspective
    Tufte, Erling A.
    Jacobson, Michael W.
    Public Works, 1995, 126 (03):
  • [48] Analysis of Competitive Environments, Business Strategies, and Performance in Hong Kong's Construction Industry
    Ho, Paul H. K.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)
  • [49] Design, construction and performance of a 40 m high reinforced fill wall in Hong Kong
    Raybould, MJ
    Hadley, D
    Boyd, M
    EARTH REINFORCEMENT, VOL 1, 1996, : 479 - 484
  • [50] Vail goes trenchless for sewer repair work
    ENR (Engineering News-Record), 1994, 233 (25):