共 50 条
- [32] Life Cycle Evaluation of Factories: The Case of a Car Body Welding Line with Pneumatic Actuators ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INNOVATIVE AND KNOWLEDGE-BASED PRODUCTION MANAGEMENT IN A GLOBAL-LOCAL WORLD, APMS 2014, PT III, 2014, 440 : 546 - 554
- [37] NEW BORING SYSTEM CUTS MACHINING TIME ENGINEERING MATERIALS AND DESIGN, 1976, 20 (09): : 22 - 22
- [39] Clamping system cuts setup, production time MANUFACTURING ENGINEERING, 2004, 132 (04): : 70 - +