共 50 条
- [41] TUNNEL CONNECTION OF 2 SHAFTS USING CONTINUOUS BORING MACHINES CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (691): : 1186 - &
- [42] DESIGN FEATURES OF THE MIXED GROUND SHIELD TUNNEL BORING MACHINES PROCEEDINGS OF THE TULA STATES UNIVERSITY-SCIENCES OF EARTH, 2019, 4 : 150 - 157
- [44] TUNNEL CONNECTION OF 2 SHAFTS USING CONTINUOUS BORING MACHINES CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (683): : 217 - &
- [46] Hard rock tunnel boring machines – State of the art 2020 Geomechanik und Tunnelbau, 2019, 12 (06): : 721 - 729
- [47] Explanations of Performance Differences in Segment Lining for Tunnel Boring Machines INTELLIGENT DATA ENGINEERING AND AUTOMATED LEARNING - IDEAL 2022, 2022, 13756 : 122 - 133
- [48] Claims and tunnel boring machines: Contributing factors and lessons learned EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 3523 - 3528
- [49] The use of neurofuzzy modeling for performance prediction of tunnel boring machines MODERN TUNNELING SCIENCE AND TECHNOLOGY, VOLS I AND II, 2001, : 583 - 588
- [50] New realization of driving Shield Tunnel Boring machines in Thailand (RE)CLAIMING THE UNDERGROUND SPACE, VOLS 1 AND 2, PROCEEDINGS, 2003, : 661 - 666