Using bim models for the design of large rail infrastructure projects: Key factors for a successful implementation

被引:0
|
作者
Nuttens T. [1 ,2 ]
Breuck V.D.E. [1 ]
Cattoor R. [3 ]
Decock K. [4 ]
Hemeryck I. [1 ]
机构
[1] TUC RAIL NV, Department Design, Unit Design Lines and Track
[2] Department of Geography, Ghent University
[3] INFRABEL, Data Governance and Project, Belgium
[4] INFRABEL, GIS and CAD
关键词
BIM implementation; Collaborative practices; Design coordination; Integrated model; Multidisciplinary projects; Rail infrastructure;
D O I
10.2495/SDP-V13-N1-73-83
中图分类号
学科分类号
摘要
As already widely acknowledged in the construction industry, the use of a BIM model as single-point-of-truth during the design and construction phase of the project’s lifecycle improves efficiency and reduces rework and extra costs. However, implementing the coordination and integration of different technical designs holds a lot of challenges. Combining different technical designs in one model in such a way that analyses, interface management and clash detection are possible, requires not only clear task descriptions and responsibilities for every stakeholder, but also a detailed workflow describing the required input, expected output of every technique and the intermediate deadlines during the design. Moreover, changes in the way the designs are made and specific configurations of the software tools are often needed to guarantee an optimal integration with the other parts of the design and to meet the firm’s specific processes. This paper describes our experience gathered the last few years with the implementation of a BIM methodology supporting the design integration of different technical disciplines in large rail infrastructure projects. The focus lies on the implementation of available technical solutions to support our methodology, to improve design efficiency and to deliver high-quality integrated study designs. So far, our results show a successful implementation of BIM in our design department, integrating the design of all technical disciplines allowing us to follow the progress of the design, improve the communication within the project team and detect and solve clashes earlier in the design process. Key factors contributing to a successful BIM implementation are further explained and illustrated with practical examples. © 2018 WIT Press.
引用
收藏
页码:73 / 83
页数:10
相关论文
共 50 条
  • [31] Design-assist, BIM key to cancer center's successful construction
    Atkinson, William, 2018, Precast/Prestressed Concrete Institute (63):
  • [32] Design flexibility in managing infrastructure projects: Contributing factors and research avenues
    Atli, Kubra
    Krystallis, Ilias
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2025, 43 (01)
  • [33] An Implementation of Public Key Infrastructure Using Wireless Communication Networks
    Nandhini, M.
    Praveenkumar, B.
    INTERNATIONAL JOURNAL OF GRID AND DISTRIBUTED COMPUTING, 2015, 8 (03): : 35 - 41
  • [34] DETERMINANT FACTORS OF SUCCESSFUL BUILDING INFORMATION MODELING (BIM) IMPLEMENTATION IN CONSTRUCTION PROJECT
    Herdyana, Hedy
    Suroso, Agus
    RUSSIAN JOURNAL OF BUILDING CONSTRUCTION AND ARCHITECTURE, 2024, (01): : 69 - 78
  • [35] An implementation of public key infrastructure using wireless communication networks
    Muthayammal Engineering College, Salem, India
    不详
    Int. J. Grid Distrib. Comput., 3 (35-42):
  • [36] The development of large public infrastructure projects: integrating policy and project studies models
    Hudon, Pierre-Andre
    Floricel, Serghei
    POLICY AND SOCIETY, 2023, 42 (02) : 148 - 163
  • [37] Automated and continuous BIM-based life cycle carbon assessment for infrastructure design projects
    Hussain, Mudasir
    Zheng, Bowen
    Chi, Hung -Lin
    Hsu, Shu-Chien
    Chen, Jieh-Haur
    RESOURCES CONSERVATION AND RECYCLING, 2023, 190
  • [38] KEY SUCCESS FACTORS AND GUIDANCE FOR INTERNATIONAL COLLABORATIVE DESIGN PROJECTS
    Soetanto, Robby
    Childs, Mark
    Poh, Paul S. H.
    Austin, Stephen
    Glass, Jacqueline
    Adamu, Zulfikar A.
    Isiadinso, Chinwe
    Tolley, Harry
    MacKenzie, Helen
    ARCHNET-IJAR INTERNATIONAL JOURNAL OF ARCHITECTURAL RESEARCH, 2015, 9 (03) : 6 - 25
  • [39] KEY FACTORS FOR SUCCESSFUL IMPLEMENTATION, MAINTENANCE, AND SUSTAINABILITY OF WORK SAFETY INTERVENTIONS
    Kirby, Neil
    Harries, Julia
    Ford, Jerry
    INJURY PREVENTION, 2021, 27 : A66 - A66
  • [40] Key Factors for a Successful Implementation of Personalized e-Health Services
    Griebel, Lena
    Sedlmayr, Brita
    Prokosch, Hans-Ulrich
    Criegee-Rieck, Manfred
    Sedlmayr, Martin
    MEDINFO 2013: PROCEEDINGS OF THE 14TH WORLD CONGRESS ON MEDICAL AND HEALTH INFORMATICS, PTS 1 AND 2, 2013, 192 : 965 - 965