Self-evolution algorithm with multi-objective for scheduling a job-shop-like knowledgeable manufacturing cell

被引:1
|
作者
School of Automation, Southeast University, Nanjing 210096, China [1 ]
不详 [2 ]
不详 [3 ]
机构
来源
Jixie Gongcheng Xuebao | / 8卷 / 156-164期
关键词
Pareto principle - Learning algorithms - Cellular manufacturing - Heuristic methods - Optimal systems - Evolutionary algorithms;
D O I
10.3901/JME.2014.08.156
中图分类号
学科分类号
摘要
It is difficult to find the global optimal solution for the multi-objective job-shop scheduling problem and the solutions obtained usually belong to the Pareto optimal ones. A multi-objective scheduling optimization model is given for the Job-shop-like knowledgeable manufacturing cell and the relationship between the multi objectives is analyzed. The properties of key arcs of tasks are presented through the analysis of its disjunctive graph and the conclusion is obtained that it is helpless to improve the function value by changing the direction of the middle key arc of job. A simplified neighborhood is proposed based on the conclusion which can reduce greatly the number of feasible solutions to be searched. A self-evolution algorithm for multi-objective scheduling problem is proposed based on the properties of the simplified neighborhood by the use of adaptive heuristic critic method whose associate search module can find the best action for the concurrent solution to obtain a better solution by learning and training, and such ability of the module will be improved continuously with the training increasing. The numerical simulation results show that the algorithm proposed has the excellent ability to search the optimal solution for the proposed scheduling problem and possesses obvious evolution capacities through learning. © 2014 Journal of Mechanical Engineering.
引用
下载
收藏
相关论文
共 50 条
  • [41] Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm
    Li, Jian
    Li, Huankun
    He, Pengbo
    Xu, Liping
    He, Kui
    Liu, Shanhui
    APPLIED SCIENCES-BASEL, 2023, 13 (14):
  • [42] Multi-objective Quantum Annealing approach for solving flexible job shop scheduling in manufacturing
    Schworm, Philipp
    Wu, Xiangqian
    Klar, Matthias
    Glatt, Moritz
    Aurich, Jan C.
    JOURNAL OF MANUFACTURING SYSTEMS, 2024, 72 : 142 - 153
  • [43] Multi-objective rescheduling of job shop scheduling problems in manufacturing using Quantum Annealing
    Schworm, Philipp
    Wu, Xiangqian
    Klar, Matthias
    Aurich, Jan C.
    Manufacturing Letters, 2024, 42 : 5 - 10
  • [44] Metaheuristic for Solving Multi-Objective Job Shop Scheduling Problem in a Robotic Cell
    Li, Xiaohui
    Yang, Xi
    Zhao, Yi
    Teng, Ying
    Dong, Yuan
    IEEE ACCESS, 2020, 8 : 147015 - 147028
  • [45] Multi-objective job shop rescheduling with evolutionary algorithm
    Hao X.C.
    Gen M.
    IEEJ Transactions on Electronics, Information and Systems, 2011, 131 (03) : 674 - 681
  • [46] An estimation of distribution algorithm for the multi-objective flexible job-shop scheduling problem
    Wang, Shengyao
    Wang, Ling
    Liu, Min
    Xu, Ye
    PROCEEDINGS OF THE 2013 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE IN SCHEDULING (CISCHED), 2013, : 1 - 8
  • [47] The performance analysis of a multi-objective immune genetic algorithm for flexible job shop scheduling
    Wu, XiuLi
    Sun, ShuDong
    Niu, GangGang
    Zhai, YinNi
    KNOWLEDGE ENTERPRISE: INTELLIGENT STRATEGIES IN PRODUCT DESIGN, MANUFACTURING, AND MANAGEMENT, 2006, 207 : 914 - +
  • [48] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [49] Optimising the job-shop scheduling problem using a multi-objective Jaya algorithm
    He, Lijun
    Li, Wenfeng
    Chiong, Raymond
    Abedi, Mehdi
    Cao, Yulian
    Zhang, Yu
    APPLIED SOFT COMPUTING, 2021, 111
  • [50] A two-stage genetic algorithm for multi-objective job shop scheduling problems
    Kachitvichyanukul, Voratas
    Sitthitham, Siriwan
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (03) : 355 - 365