共 50 条
- [41] Task Interleaving Scheduling for Phased Array Radar in Multi-Target Tracking [J]. 2018 IEEE 4TH INTERNATIONAL CONFERENCE ON CONTROL SCIENCE AND SYSTEMS ENGINEERING (ICCSSE 2018), 2018, : 347 - 350
- [42] Task-driven TAS scheduling algorithm for airborne phased array radar [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2017, 39 (03): : 536 - 541
- [43] Task scheduling algorithm for phased array radar based on shifting impact rate [J]. 1600, Chinese Institute of Electronics (39):
- [44] Optimal scheduling using hybrid GA with heuristic rules for phased array radar [J]. Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2006, 28 (07): : 992 - 996
- [45] Task Scheduling and Management of Phased Array Radar Based on Intelligent Environment Cognition [J]. 2016 INTERNATIONAL CONFERENCE ON SERVICE SCIENCE, TECHNOLOGY AND ENGINEERING (SSTE 2016), 2016, : 369 - 375
- [46] Scheduling Method for Phased Array Radar over Chaos Adaptively Genetic Algorithm [J]. 2016 SIXTH INTERNATIONAL CONFERENCE ON INFORMATION SCIENCE AND TECHNOLOGY (ICIST), 2016, : 111 - 116
- [47] Phased Array Radar Task Scheduling Algorithm Based on Branch and Bound Method [J]. Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2019, 47 (06): : 1309 - 1315
- [49] Dynamic priority scheduling method for the air-defence phased array radar [J]. IET RADAR SONAR AND NAVIGATION, 2017, 11 (07): : 1140 - 1146
- [50] Study on the beamforming issues of broadband phased array radar [J]. Xi Tong Cheng Yu Dian Zi Ji Shu/Syst Eng Electron, 2008, 3 (452-454): : 452 - 454