Key Design Techniques for Egongyan Railway Transit Bridge

被引:0
|
作者
Zang, Yu [1 ]
Dai, Jian-Guo [1 ]
Shao, Chang-Yu [1 ]
机构
[1] Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai,200092, China
关键词
Suspensions (components) - Suspension bridges - Piles - Cable stayed bridges - Bridge cables;
D O I
暂无
中图分类号
学科分类号
摘要
The Egongyan Rail Transit Bridge in Chongqing is located 70 m upstream of the existing Egongyan Bridge, the main bridge of which is a self-anchored suspension structure of a semi-floating system, with five spans of 50, 210, 600, 210 and 50 m. The stiffening girder incorporates the steel boxes in the central and side spans and the concrete boxes in the anchor spans and the anchor sections. The towers are portal-frame structures, designed as full-cross-section compressive components. The main cables, composed of steel wire strands installed by PPWS method, are arranged in parallel with center-to-center distance of 19.5 m. The side and central spans all have hanger cables comprising parallel steel strands. The hanger cables are connected with the main cable clamps via pin connection, and anchored to the stiffening girder by anchor boxes. The two legs of the tower have separated pile caps, beneath each pile cap are 9, φ3.0 m bored piles. Vertical and horizontal diaphragms are added on the anchor cross beams to divide the anchor chamber into 4 cells, with the intention of optimizing the load bearing capacity of the anchor cross beams of the main cable. The results of analysis show that the global and local stability of the bridge meets the related code requirements. Restricted by the built conditions, the bridge was constructed first as a cable-stayed structure, and then transformed to be the final suspended structure, which is an innovation in bridge construction. © 2020, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
下载
收藏
页码:82 / 87
相关论文
共 50 条
  • [41] Design of the new Northern Danube railway bridge in Budapest
    Solymossy, Imre
    Gondar, Peter
    BRIDGES IN DANUBE BASIN 2016 - NEW TRENDS IN BRIDGE ENGINEERING AND EFFICIENT SOLUTION FOR LARGE AND MEDIUM SPAN BRIDGES, 2016, 156 : 458 - 465
  • [42] Design of Main Bridge of Yelang River Bridge on Chongqing-Guiyang Railway
    Guo, Lun-Bo
    Bridge Construction, 2019, 49 (05): : 85 - 90
  • [43] Design of Main Bridge of Yachi River Bridge on Chengdu-Guiyang Railway
    Wang, Le-Bing
    Mei, Xin-Yong
    Su, Yang
    Bridge Construction, 2020, 50 : 99 - 103
  • [44] CHINA HIGH-SPEED RAILWAY BRIDGE CONSTRUCTION KEY TECHNOLOGIES
    Lei, Junqing
    Zhang, Kun
    Guo, Dongchen
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 699 - 704
  • [45] Scheme Design and Research of the Main Bridge of Yicheng Hanjiang River Railway Bridge
    Li, Weidong
    Journal of Railway Engineering Society, 2023, 40 (02): : 29 - 34
  • [46] Design of main bridge of Minjiang River Bridge on Fuzhou-Pingtan Railway
    Liu, Qing-Jiang
    Bridge Construction, 2014, 44 (02) : 73 - 77
  • [47] Key Erection Techniques for Main Bridge Steel Girder of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Liu, Ai-Lin
    Li, Xu
    Bridge Construction, 2020, 50 (01) : 1 - 6
  • [48] Key Construction Techniques for Main Bridge of Yangsigang Changjiang River Bridge in Wuhan
    Li, Xing-Hua
    Pan, Dong-Fa
    Bridge Construction, 2020, 50 (04) : 9 - 16
  • [49] Key Design and Construction Techniques for Collisionproof Steel Cofferdam for Large Span Cable-stayed Bridge
    Li, Weizhou
    Feng, Zhongju
    Hu, Zhongchao
    Xun, Dongliang
    Zeng, Jian
    Peng, Qiang
    INNOVATION IN CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE, 2012, 238 : 677 - +
  • [50] Design of Main Bridge of Shuangbao Bridge of Second Chongqing-Hunan Railway in Chongqing
    Liu Q.
    Nie S.-J.
    Ding S.-L.
    Zheng G.-H.
    Bridge Construction, 2023, 53 : 16 - 24