共 50 条
- [41] Scheduling a Constrained Hybrid Flow Shop Problem by Heuristic Algorithm [J]. 26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2532 - 2537
- [42] A hybrid heuristic neighborhood algorithm for the job shop scheduling problem [J]. ICNC 2008: FOURTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION, VOL 6, PROCEEDINGS, 2008, : 412 - 416
- [43] Solving Large-scale Relay Satellite Scheduling Problem with A Dynamic Population Firework Algorithm: A Case Study [J]. 2021 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (IEEE SSCI 2021), 2021,
- [46] Aircraft dynamic scheduling algorithm research based on heuristic column generation algorithm [J]. INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2364 - 2368