共 50 条
- [41] Design of Severe Accident Management Systems for Beyond Design Basis External Hazards at Paks Nuclear Power Plant JOURNAL OF NUCLEAR ENGINEERING AND RADIATION SCIENCE, 2018, 4 (02):
- [42] Safety Design Features for Defense-in-Depth against Beyond Design Basis Accidents For Cernavoda NPP - Units 3 & 4 PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2014, VOL 6, 2014,
- [46] Beyond Design Basis Seismic Analysis for Atucha II Nuclear Plant PROCEEDINGS OF THE 20TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING AND THE ASME 2012 POWER CONFERENCE - 2012, VOL 5, 2012, : 625 - 634
- [47] Analysis of discharge activity thresholds of liquid waste discharge system for Qinshan Nuclear Power Plant Phase II extension project Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2009, 43 (SUPPL.): : 342 - 345
- [48] STUDY ON NPP REACTIVITY ACCIDENT OPERATING STRATEGY DESIGN BASED ON FUNCTION ANALYSIS AND TASK ANALYSIS TECHNOLOGY PROCEEDINGS OF THE 26TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2018, VOL 1, 2018,
- [49] THE CHERNOBYL ACCIDENT - A CHALLENGE ON PSA AS A TOOL FOR THE PREDICTION OF EVENT SCENARIOS BEYOND THE DESIGN BASIS AND FOR SAFETY IMPROVEMENTS RES MECHANICA, 1990, 29 (02): : 167 - 176