共 50 条
- [1] THE STATISTICAL DETERMINATION OF THE INVESTMENT SCHEDULE [J]. ECONOMETRICA, 1944, 12 (01) : 89 - 90
- [7] Fuzzy comprehensive optimization of hydropower project schedule with consideration of investment and risk [J]. Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2008, 41 (09): : 1109 - 1115
- [9] Research of schedule control and investment control based on the workbench of information system project surveillance [J]. FRONTIERS IN ENTERPRISE INTEGRATION, 2008, : 101 - 109