共 50 条
- [42] HOW TO IMPROVE STEAM-GENERATOR RELIABILITY - A CANADIAN PERSPECTIVE NUCLEAR ENGINEERING INTERNATIONAL, 1995, 40 (490): : 41 - 44
- [45] FOSSIL STEAM TURBINE UPGRADES/MODERNIZATIONS: CASE STUDIES OF RECENTLY COMPLETED PROJECTS AND THE INDUSTRY CHALLENGES MOVING FORWARD PROCEEDINGS OF THE ASME POWER CONFERENCE 2008, 2008, : 293 - 297
- [48] A REDESIGN STRATEGY TO IMPROVE THE EFFICIENCY OF A 17-STAGE STEAM TURBINE PROCEEDINGS OF ASME TURBO EXPO 2009, VOL 7, PTS A AND B, 2009, : 1463 - 1470
- [50] A Redesign Strategy to Improve the Efficiency of a 17-Stage Steam Turbine JOURNAL OF TURBOMACHINERY-TRANSACTIONS OF THE ASME, 2012, 134 (03):