Optimal sensor placement for health monitoring of boom structure of concrete pump truck

被引:0
|
作者
Hua, Guang-Jun [1 ]
Wu, Yun-Xin [1 ]
机构
[1] College of Mechanical and Electrical Engineering, State Key Laboratory for High Performance Complex Manufacturing, Central South University, Changsha 410083, Hunan, China
关键词
Comprehensive evaluation - Concrete pump truck - Flexible multi bodies - Optimal sensor placement - Structure health monitoring - Support degree matrix;
D O I
10.3969/j.issn.1000-565X.2012.12.008
中图分类号
学科分类号
摘要
In order to implement the optimal placement of strain sensors for the health monitoring of flexible multi-body structures such as the boom structure of concrete pump trucks, a fuzzy support degree matrix is constructed by using the correlation coefficients of strain signals of the measuring points to be selected, and the comprehensive support degree of each measuring point is calculated. Then, some factors, such as the stress level, the sensor installation difficulty, the measuring point security and the stress gradient, are classified and standardized, and the weight of each factor is determined through an analytical hierarchy process. Moreover, the sensor locations are optimized according to the comprehensive evaluation results. Finally, a typical four-segment boom concrete pump truck is selected as the object to perform the sensor placement optimization under four different working conditions. The results show that the proposed comprehensive evaluation method is both stable and feasible.
引用
收藏
页码:41 / 46
相关论文
共 50 条
  • [1] Fatigue life prediction for boom structure of concrete pump truck
    Wu, Yaozhong
    Li, Weijia
    Liu, Yonghong
    ENGINEERING FAILURE ANALYSIS, 2016, 60 : 176 - 187
  • [2] Modal Analysis of Concrete Pump Truck Boom
    Mao, Kunli
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 148 - 151
  • [3] Study of Concrete Pump Truck Structural Health Monitoring
    Hua, Guangjun
    Wu, Yunxin
    Wang, Shuai
    MANUFACTURING ENGINEERING AND AUTOMATION I, PTS 1-3, 2011, 139-141 : 2513 - 2516
  • [4] Choice of truck for installation of concrete pump and distribution boom
    Koshkarev, Y. V.
    Stepanov, M. A.
    INNOVATIVE MANUFACTURING ENGINEERING AND ENERGY (IMANEE 2019) - 50 YEARS OF HIGHER TECHNICAL EDUCATION AT THE UNIVERSITY OF PITESTI, 2019, 564
  • [5] A review on optimal sensor placement for health monitoring
    Liao CanXing
    Li Xingshan
    Zhang Ping
    Dai Jing
    ICEMI 2007: PROCEEDINGS OF 2007 8TH INTERNATIONAL CONFERENCE ON ELECTRONIC MEASUREMENT & INSTRUMENTS, VOL IV, 2007, : 170 - 173
  • [6] Structural design and analysis of CFRP boom for concrete pump truck
    Lee, Sang-Jin
    Chung, Il-Sup
    Bae, Sung-Youl
    MODERN PHYSICS LETTERS B, 2019, 33 (14-15):
  • [7] Automatic pouring of truck-mounted concrete boom pump
    Zhou, Shuwen
    Lawrance, William
    Zhang, Siqi
    INTERNATIONAL JOURNAL OF AUTOMATION AND CONTROL, 2007, 1 (04) : 275 - 283
  • [8] The Truck Mounted Concrete Boom Pump: A Dynamic Numerical Model
    Cazzulani, G.
    Giberti, H.
    Resta, F.
    Ripamonti, F.
    WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL III, 2011, : 1998 - 2003
  • [9] Dynamic analysis on placing boom system of truck concrete pump
    Guo, LX
    Zhang, GZ
    Wang, BF
    ICVE'98: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON VIBRATION ENGINEERING, VOL I, 1998, : 148 - 152
  • [10] Optimal Sensor Placement for Modal-Based Health Monitoring of a Composite Structure
    Rucevskis, Sandris
    Rogala, Tomasz
    Katunin, Andrzej
    SENSORS, 2022, 22 (10)