The Truck Mounted Concrete Boom Pump: A Dynamic Numerical Model

被引:0
|
作者
Cazzulani, G. [1 ]
Giberti, H.
Resta, F.
Ripamonti, F. [1 ]
机构
[1] Politecn Milan, Dept Mech Engn, Milan, Italy
关键词
flexible system; concrete pumping; co-simulation; nonlinear dynamics;
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Concrete pump booms are subjected to vibrations that increase mechanical stress and shorten their lifespan. This paper aims to study the problem by considering the two subsystems, the boom and the concrete pump, that have the greatest effect on the phenomenon. The authors supply numerical and experimental tools that can analyze the problem in depth in all its complexity. First, the systems were investigated independently, to identify their individual aspects. Then a numerical model was created to reproduce the behavior of the whole system and the interaction between boom and pump. The result was a new powerful tool for investigating passive and active solutions for suppressing vibration.
引用
收藏
页码:1998 / 2003
页数:6
相关论文
共 50 条
  • [1] Automatic pouring of truck-mounted concrete boom pump
    Zhou, Shuwen
    Lawrance, William
    Zhang, Siqi
    INTERNATIONAL JOURNAL OF AUTOMATION AND CONTROL, 2007, 1 (04) : 275 - 283
  • [2] Modal Analysis of the Boom System of Truck-mounted Concrete Pump
    Zhou Xinxiang
    Xu Changlu
    Ren Nannan
    Guo Shujun
    Tian Rongliang
    MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 3620 - +
  • [3] Boom System Kinematic Simulation of Truck-Mounted Concrete Pump
    Zhou, Xinxiang
    Ren, Nannan
    Guo, Shujun
    Tang, Yanling
    Tian, Rongliang
    ADVANCED MANUFACTURING SYSTEMS, PTS 1-3, 2011, 201-203 : 185 - 188
  • [4] Control Stabilization of Multilink Manipulators in a Truck-mounted Concrete Boom Pump
    Sophie Zorn
    Frank Will
    Peter Mögle
    ATZoffhighway worldwide, 2018, 11 (3): : 44 - 49
  • [5] Dynamic analysis on placing boom system of truck concrete pump
    Guo, LX
    Zhang, GZ
    Wang, BF
    ICVE'98: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON VIBRATION ENGINEERING, VOL I, 1998, : 148 - 152
  • [6] Co-simulation on automatic pouring of truck-mounted concrete boom pump
    Zhou, Shuwen
    Zhang, Siqi
    2007 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS, VOLS 1-6, 2007, : 928 - +
  • [7] Strength and Finite Element Analysis of the Boom System of Truck-mounted Concrete Pump
    Zhou, Xinxiang
    Cui, Yu
    Ren, Nannan
    Tang, Yanling
    Guo, Shujun
    Tian, Rongliang
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-3, 2011, 295-297 : 2079 - 2082
  • [8] Modal Analysis of Concrete Pump Truck Boom
    Mao, Kunli
    ENGINEERING SOLUTIONS FOR MANUFACTURING PROCESSES IV, PTS 1 AND 2, 2014, 889-890 : 148 - 151
  • [9] Numerical simulation and vibration characteristics of boom system of concrete pump truck test rig
    Ren, Wu
    Wu, Yunxin
    Hua, Guangjun
    Zhang, Zhaowei
    Zeng, Yihui
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2014, 45 (04): : 1065 - 1070
  • [10] Choice of truck for installation of concrete pump and distribution boom
    Koshkarev, Y. V.
    Stepanov, M. A.
    INNOVATIVE MANUFACTURING ENGINEERING AND ENERGY (IMANEE 2019) - 50 YEARS OF HIGHER TECHNICAL EDUCATION AT THE UNIVERSITY OF PITESTI, 2019, 564