Study on re-entrant flow-shop scheduling problem (optimization by mixed integer programming)

被引:0
|
作者
机构
[1] Hino, Rei
[2] Osada, Tomoya
来源
Hino, R. (hino@mech.nagoya-u.ac.jp) | 1600年 / Japan Society of Mechanical Engineers卷 / 79期
关键词
Manufacturing activities - Manufacturing process - Mixed integer programming - Optimization procedures - Optimum solution - Production resources - Re-entrant flow shops - Stepwise optimization;
D O I
10.1299/kikaic.79.1112
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [31] Proactive maintenance scheduling in a re-entrant flow shop using Lagrangian decomposition coordination method
    Kaihara, T.
    Fujii, N.
    Tsujibe, A.
    Nonaka, Y.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) : 453 - 456
  • [32] Solving the Distributed Permutation Flow-Shop Scheduling Problem Using Constrained Programming
    Gogos, Christos
    APPLIED SCIENCES-BASEL, 2023, 13 (23):
  • [33] Uncertain Random Dependent-Chance Programming for Flow-Shop Scheduling Problem
    Touil, Achraf
    Echchatbi, Abdelwahed
    2020 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE), 2020,
  • [34] Adaptive fuzzy particle swarm optimization for flow-shop scheduling problem
    Galzina, Vjekoslav
    Lujić, Roberto
    Šarić, Tomislav
    Tehnicki Vjesnik, 2012, 19 (01): : 151 - 157
  • [35] Mixed binary integer programming formulations for the reentrant job shop scheduling problem
    Pan, JCH
    Chen, JS
    COMPUTERS & OPERATIONS RESEARCH, 2005, 32 (05) : 1197 - 1212
  • [36] Multi-objective re-entrant hybrid flow shop scheduling problem considering fuzzy processing time and delivery time
    Geng, Kaifeng
    Wu, Shaoxing
    Liu, Li
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2022, 43 (06) : 7877 - 7890
  • [37] Mixed Integer linear programming and constraint programming models for the online printing shop scheduling problem
    Lunardi, Willian T.
    Birgin, Ernesto G.
    Laborie, Philippe
    Ronconi, Debora P.
    Voos, Holger
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [38] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [39] An analytical investigation of the scheduling problem for capacitated re-entrant lines
    Choi, JY
    Reveliotis, S
    2002 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION, VOLS I-IV, PROCEEDINGS, 2002, : 3193 - 3198
  • [40] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113