Box girder bridges - Steel bridges - Railroads - Rivers - Beams and girders - Steel structures - Piers - Plates (structural components);
D O I
暂无
中图分类号
学科分类号
摘要
The three-span continuous steel box girders arranged in (47.35+80+47.35) m of the roadway approach bridge of the rail-cum-road section of Tongling Changjiang River Bridge on Hefei-Fuzhou Railway are located over the railway decks and are separated into two parts of the girders of the upstream and downstream sides. A part of the girders is the single-cell single-box structure. The width of the top plate of the structure is 16.5 m, the spacing between the webs is 8.5 m and the width of the cantilever of the top plate on each side is 4 m. The height of the steel box girders from the ground is about 52 m and the construction of the girders is therefore a kind of the work done very high above the ground. In the construction of the girders, the assembling platform and movable scaffoldings were arranged on the upstream side railway deck. The girders were manufactured in blocks in the workshop, transported to the construction site by water, unloaded at the wharf at the site and again transported on land to the pier sites. The blocks of the girders were lifted onto the assembling platform by the fixed deck crane at the pier site where they were assembled into the incomplete girders and the girders were longitudinally shifted on the slipway and connected with the previously installed girders. The patr of the girders on the downstream side was later on integrally and transversely shifted in place, lowered down onto the bearings and thus far, the construction of the girders was completed. The working procedures of the whole construction process of the steel box girders of the roadway approach bridge are simple and the safety of the construction is controllable.
引用
收藏
相关论文
共 50 条
  • [21] Key Techniques to Relocate 1 600 t-Capacity Crane in Construction of Tongling Changjiang River Rail-cum-Road Bridge Carrying a Section of G3 Expressway
    Wang, Qingyun
    He, Minghui
    Bridge Construction, 2024, 54 (06) : 140 - 145
  • [22] Construction monitoring and control of steel truss girder cable-stayed bridge of Huanggang Changjiang River Rail-cum-Road bridge
    Li, Wei-Hua
    Yang, Guang-Wu
    Yue, Qing
    Wu, Guo-Qiang
    Bridge Construction, 2013, 43 (03) : 11 - 17
  • [23] Key Techniques for Construction of Pylons of Wuhu Changjiang River Rail-cum-Road Bridge on Shangqiu-Hefei-Hangzhou Railway
    Wang, Ling-Xia
    Liu, Ai-Lin
    Bridge Construction, 2019, 49 (04): : 1 - 6
  • [24] Key Construction Techniques for Pingtan Straits Rail-cum-Road Bridge
    Liu, Zi-Ming
    Bridge Construction, 2019, 49 (05): : 1 - 8
  • [25] Construction techniques for main pier foundations of Yibin Jinsha River Rail-cum-Road Bridge
    Liu, Cui-Yun
    Dai, Hao
    Bridge Construction, 2016, 46 (02): : 97 - 102
  • [26] Key Techniques for Constructing Foundation of Pier No.2 of Wuhu Changjiang River Rail-cum-Road Bridge
    Zhang, Shu-Cai
    Bridge Construction, 2019, 49 (03) : 6 - 10
  • [27] Design of Pylons of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Chen, Zhitao
    Huang, Xijun
    Liu, Hanshun
    Yang, Xueqi
    Bridge Construction, 2024, 54 (03) : 1 - 7
  • [28] Pylon Concrete Crack Resistant Techniques for Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Long Y.
    Liu A.-L.
    Dong J.-H.
    Huang B.
    Ge K.-Y.
    Bridge Construction, 2023, 53 (03) : 8 - 15
  • [29] Key Construction Techniques for Cofferdam of Pier Z4 of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Dun L.
    Wang L.-X.
    Bridge Construction, 2023, 53 (02) : 10 - 16
  • [30] Design of steel truss girder cable-stayed bridge of 567-m main span of Huanggang Changjiang River Rail-cum-Road Bridge
    Li, Wei-Hua
    Yang, Guang-Wu
    Xu, Wei
    Bridge Construction, 2013, 43 (02) : 10 - 15