Spudcan bearing capacity calculation of the offshore jack-up drilling platform during the preloading process

被引:0
|
作者
Zhang, Puyang [1 ,2 ]
Yu, Xiaoyang [3 ]
Ding, Hongyan [1 ,2 ]
机构
[1] School of Civil Engineering, Tianjin University, Tianjin 300072, China
[2] Key Laboratory of Coast Civil Structure Safety (Tianjin University), Ministry of Education, Tianjin 300072, China
[3] State Nuclear Electric Power Planning Design and Research Institute, Beijing 100094, China
关键词
Compilation and indexing terms; Copyright 2024 Elsevier Inc;
D O I
暂无
中图分类号
学科分类号
摘要
Finite element method - Drilling platforms - Offshore drilling - Soils
引用
收藏
页码:613 / 619
相关论文
共 50 条
  • [41] Punch-Through Structural Analysis of Jack-up Rigs During Preloading of the Foundations
    Chakrabarti, Partha
    Chawan, Abhijeet
    PROCEEDINGS OF THE ASME 38TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2019, VOL 1, 2019,
  • [42] FABRICATION AND ERECTION OF JACK-UP DRILLING PLATFORM LEGS OF HEAT-TREATED STEELS
    CRAWFORD, DC
    WALKER, JH
    JOURNAL OF PETROLEUM TECHNOLOGY, 1967, 19 (09): : 1167 - &
  • [43] Research on Risk Analysis Method of Jack-Up Drilling Platform Pile Leg Puncture
    CNOOC China Limited, Tianjin Branch, Tianjin, China
    不详
    Chem. Technol. Fuels Oils, 1 (219-226):
  • [44] Experimental research on ventilation characteristics of a main engine room in a jack-up offshore platform
    Xie, Yingchun
    Qin, Jin
    Zhu, Jinchi
    Liu, Guijie
    Zheng, Zepeng
    Yuan, Haoxun
    APPLIED OCEAN RESEARCH, 2021, 117 (117)
  • [45] Effect of Deployment of Jack-Up on Piles and Structure of Existing Offshore platform—A Case Study
    Institute of Engineering and Ocean Technology , ONGC, Panvel, Maharashtra, India
    Lect. Notes Civ. Eng., 2366, (641-652):
  • [46] Research on Risk Analysis Method of Jack-Up Drilling Platform Pile Leg Puncture
    Jie Xu
    Yao Zhou
    Qianling Xue
    Qianhua Liao
    Guojie Cui
    Tao Xie
    Haiyu Li
    Chemistry and Technology of Fuels and Oils, 2023, 59 : 219 - 226
  • [47] Research on Risk Analysis Method of Jack-Up Drilling Platform Pile Leg Puncture
    Xu, Jie
    Zhou, Yao
    Xue, Qianling
    Liao, Qianhua
    Cui, Guojie
    Xie, Tao
    Li, Haiyu
    CHEMISTRY AND TECHNOLOGY OF FUELS AND OILS, 2023, 59 (01) : 219 - 226
  • [48] On the seakeeping behaviour of an offshore wind farm vessel during the jack-up process in the early design stage
    Liebert, M.
    SUSTAINABLE DEVELOPMENT AND INNOVATIONS IN MARINE TECHNOLOGIES, 2020, 3 : 102 - 109
  • [49] SEA-KEEPING ANALYSIS OF AN OFFSHORE WIND FARM INSTALLATION VESSEL DURING THE JACK-UP PROCESS
    Augener, Philip H.
    Hatecke, Hannes
    33rd International Conference on Ocean, Offshore and Arctic Engineering, 2014, Vol 1A, 2014,
  • [50] Calculation and analysis of the wave load of jack-up offshore wind turbine installation vessel during dynamic positioning
    Yao, Zhenqiu
    Shen, Yun
    Gu, Xin
    Bu, Linxin
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON INFORMATION SCIENCES, MACHINERY, MATERIALS AND ENERGY (ICISMME 2015), 2015, 126 : 1043 - 1047