Active tectonics along site and neighborhood of west route of South-to-North Water Transfer Project in China

被引:0
|
作者
Ran, Yong-Kang [1 ]
Li, Jian-Biao [1 ]
Min, Wei [1 ]
Han, Zhu-Jun [1 ]
Chen, Li-Chun [1 ]
机构
[1] Institute of Geology, China Earthquake Administration, Beijing 100029, China
关键词
Dislocations (crystals) - Engineering geology - Stresses - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
The first stage project of the west route of South-to-North Water Transfer Project is located in Bayankela block interior of the eastern Qinghai-Tibet Plateau. The boundary of Bayankela block is all the giant strike-slip or thrust fault systems, which have intense activity; and the boundary belts are the primary sites of the accumulation and release of stress resulted from the blocks movement. The fault activity is weaker in Bayankela block interior than that of the boundary belts. Partial faults of Gande-Aba fault system, Seda-Luoruo fault, and Kangle fault, etc., were active at one time since Late Pleistocene epoch. However, they have weaker active intensity than the boundary belt. The average displacement rates of the block boundary faults in the late Quaternary Period were generally more than 7 mm/a; the maximum value was up to 18 mm/a, and the minimum one was 1-2 mm/a; however, the slip rate of the most primary active fault at the raceway vicinity is only 0.18 mm/a. In general, the crust of the project site is relative stable. The maximum dip-offset of the faults needed to be protected for the project during useful life has been deduced; for example, for the Aba basin north marginal fault and the Shunhe fault the maximum value is 0.67 m and 2.62 m, respectively.
引用
收藏
页码:3664 / 3672
相关论文
共 50 条
  • [31] Simulation system of south-to-north water transfer project
    Yang, Fang-Ting
    Lai, Chun-Jie
    Xitong Fangzhen Xuebao / Journal of System Simulation, 2002, 14 (12):
  • [32] Quantitative standard of eco-compensation for the water source area in the middle route of the South-to-North Water Transfer Project in China
    Dong, Zhanfeng
    Wang, Jinnan
    FRONTIERS OF ENVIRONMENTAL SCIENCE & ENGINEERING IN CHINA, 2011, 5 (03): : 459 - 473
  • [33] The Problem and Countermeasure of Lake Environment along the Route of South-to-north Water Transfer in Shandong Province
    Lu Honghai
    Chen Shiyue
    PROCEEDINGS OF SYMPOSIUM FROM CROSS-STRAIT ENVIRONMENT & RESOURCES AND 2ND REPRESENTATIVE CONFERENCE OF CHINESE ENVIRONMENTAL RESOURCES & ECOLOGICAL CONSERVATION SOCIETY, 2010, : 232 - 235
  • [34] Quantitative standard of eco-compensation for the water source area in the middle route of the South-to-North Water Transfer Project in China
    Zhanfeng Dong
    Jinnan Wang
    Frontiers of Environmental Science & Engineering in China, 2011, 5 : 459 - 473
  • [35] Risk analysis of floodwater resources utilization along water diversion project: a case study of the Eastern Route of the South-to-North Water Diversion Project in China
    Fang, Guohua
    Zhu, Xiaohua
    Huang, Xianfeng
    WATER SUPPLY, 2019, 19 (08) : 2464 - 2475
  • [36] Design and research on water regulation system for Mid-route of South-to-North Water Transfer Project
    Yang Yun-song
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1865 - 1871
  • [38] Water Allocation and its Impact on Recipient Areas of East Route of the South-to-North Water Transfer Project
    Hong, Gan
    Yangwen, Jia
    Jinjun, You
    PROCEEDINGS OF THE 3RD INTERNATIONAL YELLOW RIVER FORUM ON SUSTAINABLE WATER RESOURCES MANAGEMENT AND DELTA ECOSYSTEM MAINTENANCE, VOL V, 2007, : 67 - 76
  • [39] Assessment and Management of Pressure on Water Quality Protection along the Middle Route of the South-to-North Water Diversion Project
    Han, Baolong
    Meng, Nan
    Zhang, Jiatian
    Cai, Wenbo
    Wu, Tong
    Kong, Lingqiao
    Ouyang, Zhiyun
    SUSTAINABILITY, 2019, 11 (11)
  • [40] Study on the Pan-basin optimization of West route engineering of South-to-North water transfer
    Zhang, J.
    Peng, S.
    Wang, Y.
    Wang, H.
    DAMS AND RESERVOIRS UNDER CHANGING CHALLENGES, 2011, : 541 - 549