Active tectonics along site and neighborhood of west route of South-to-North Water Transfer Project in China

被引:0
|
作者
Ran, Yong-Kang [1 ]
Li, Jian-Biao [1 ]
Min, Wei [1 ]
Han, Zhu-Jun [1 ]
Chen, Li-Chun [1 ]
机构
[1] Institute of Geology, China Earthquake Administration, Beijing 100029, China
关键词
Dislocations (crystals) - Engineering geology - Stresses - Tunnels;
D O I
暂无
中图分类号
学科分类号
摘要
The first stage project of the west route of South-to-North Water Transfer Project is located in Bayankela block interior of the eastern Qinghai-Tibet Plateau. The boundary of Bayankela block is all the giant strike-slip or thrust fault systems, which have intense activity; and the boundary belts are the primary sites of the accumulation and release of stress resulted from the blocks movement. The fault activity is weaker in Bayankela block interior than that of the boundary belts. Partial faults of Gande-Aba fault system, Seda-Luoruo fault, and Kangle fault, etc., were active at one time since Late Pleistocene epoch. However, they have weaker active intensity than the boundary belt. The average displacement rates of the block boundary faults in the late Quaternary Period were generally more than 7 mm/a; the maximum value was up to 18 mm/a, and the minimum one was 1-2 mm/a; however, the slip rate of the most primary active fault at the raceway vicinity is only 0.18 mm/a. In general, the crust of the project site is relative stable. The maximum dip-offset of the faults needed to be protected for the project during useful life has been deduced; for example, for the Aba basin north marginal fault and the Shunhe fault the maximum value is 0.67 m and 2.62 m, respectively.
引用
收藏
页码:3664 / 3672
相关论文
共 50 条
  • [1] Evaluations for hydrogeological conditions along west route of south-to-north water transfer project
    Wang, Yuan
    Wang, Xue-Chao
    Wang, Jian-Ping
    Shi, Shou-Liang
    Zong, Guo-Qing
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2005, 24 (20): : 3614 - 3619
  • [2] Back analysis of initial geostress field of dam site in west route of South-to-North water transfer project
    Pei Qi-tao
    Li Hai-bo
    Liu Ya-qun
    ROCK AND SOIL MECHANICS, 2012, 33 : 338 - 344
  • [3] Coincidence probability of precipitation for the middle route of South-to-North water transfer project in China
    Yan, Baowei
    Chen, Lu
    JOURNAL OF HYDROLOGY, 2013, 499 : 19 - 26
  • [4] Water Dispatch Model for Middle Route of a South-to-North Water Transfer Project in China1
    Chang, Jian-xia
    Wang, Yi-min
    Huang, Qiang
    JOURNAL OF THE AMERICAN WATER RESOURCES ASSOCIATION, 2011, 47 (01): : 70 - 80
  • [5] Water-energy nexus of the Eastern Route of China's South-to-North Water Transfer Project
    Chen, Dan
    Zhang, Di
    Luo, Zhaohui
    Webber, Michael
    Rogers, Sarah
    WATER POLICY, 2019, 21 (05) : 945 - 963
  • [6] Environment and sustainability of the Middle Route, South-to-North Water Transfer Project in China: a close look
    Xu, Xiang-Zhou
    Song, Guo-Dong
    Dang, Tian-Min
    Liu, Jian-Wei
    Zhang, Hong-Wu
    Gao, Hang
    Liu, Ya-Kun
    ENVIRONMENT DEVELOPMENT AND SUSTAINABILITY, 2018, 20 (06) : 2415 - 2426
  • [7] China's South-to-North Water Transfer Project: Is it Needed?
    He, Chansheng
    He, Xiaoying
    Fu, Li
    GEOGRAPHY COMPASS, 2010, 4 (09): : 1312 - 1323
  • [8] Environment and sustainability of the Middle Route, South-to-North Water Transfer Project in China: a close look
    Xiang-Zhou Xu
    Guo-Dong Song
    Tian-Min Dang
    Jian-Wei Liu
    Hong-Wu Zhang
    Hang Gao
    Ya-Kun Liu
    Environment, Development and Sustainability, 2018, 20 : 2415 - 2426
  • [9] Research on Operational Risk Management of the Eastern Route of South-to-North Water Transfer Project in China
    Chen, J. F.
    Yang, L.
    Weng, Y.
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 2877 - 2881
  • [10] Simulation of Transport Channel in China's Middle Route South-to-North Water Transfer Project
    方神光
    魏加华
    吴保生
    尚毅梓