BIM-based collaborative work model and information utilization framework for IPD projects

被引:0
|
作者
Ma, Zhiliang [1 ]
Zhang, Dongdong [1 ]
Ma, Jiankun [1 ]
机构
[1] Ma, Zhiliang
[2] Zhang, Dongdong
[3] Ma, Jiankun
来源
Ma, Zhiliang | 1600年 / Science Press卷 / 42期
关键词
Building Information Model - BIM - Collaborative Work - Implementation process - Information utilization - Integrated project deliveries - IPD-projects - Literature reviews;
D O I
10.3969/j.issn.0253-374x.2014.09.004
中图分类号
学科分类号
摘要
To support integrated project delivery (IPD) projects, this research aims at developing a collaborative work platform. Based on a literature review of IPD cases, specific characteristics of IPD projects are summarized and a collaborative work model is established to reflect the implementation process of IPD projects. With the model, the information utilization mechanism for IPD projects is analyzed and a building information modeling (BIM)-based framework for information utilization serving IPD projects is established, which lays a sound foundation for the development of BIM-based collaborative work platform supporting IPD projects.
引用
收藏
页码:1325 / 1332
相关论文
共 50 条
  • [21] BIM-Based Knowledge Management in Construction Projects
    Wang, Hao
    Meng, Xianhai
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2018, 9 (02) : 20 - 37
  • [22] BIM-based benchmarking for healthcare construction projects
    Choi, Jiyong
    Leite, Fernanda
    de Oliveira, Daniel P.
    Automation in Construction, 2020, 119
  • [23] A Framework for BIM-based Quality Supervision Model in Project Management
    Gang, Jun
    Feng, Chun
    Shu, Wei
    PROCEEDINGS OF THE THIRTEENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, VOL 2, 2020, 1002 : 234 - 242
  • [24] Integrated system for BIM-based collaborative design
    Oh, Minho
    Lee, Jaewook
    Hong, Seung Wan
    Jeong, Yongwook
    AUTOMATION IN CONSTRUCTION, 2015, 58 : 196 - 206
  • [25] BIM-based multi-objective optimization framework for volumetric analysis of building projects
    Padala, S. P. Sreenivas
    Skanda, Prabhanjan M.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2024,
  • [26] BIM-based framework to quantify delays and cost overruns due to changes in construction projects
    Honnappa D.
    Padala S.P.S.
    Asian Journal of Civil Engineering, 2022, 23 (5) : 707 - 725
  • [27] BIM-BASED PROGRAM INFORMATION MANAGEMENT SYSTEMS FOR URBAN RENEWAL MEGA PROJECTS PLANNING
    Choi, Hyeon-Jeong
    Kwon, Min-Ji
    Kim, Ju-Hyung
    Kim, Jae-Jun
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 294 - 304
  • [28] Challenges in construction readiness for BIM-based building projects
    Radzi, Afiqah R.
    Azmi, Nur Farhana
    Kamaruzzaman, Syahrul Nizam
    Algahtany, Mohammed
    Rahman, Rahimi A.
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [29] BIM-based cost management of large engineering projects
    Lan, Lei
    PROCEEDINGS OF THE 2014 INTERNATIONAL CONFERENCE ON EDUCATION TECHNOLOGY AND INFORMATION SYSTEM (ICETIS 2014), 2014, 115 : 442 - 445
  • [30] BIM-Based Approach to House Renovation Projects Assessment
    Strug, Barbara
    Slusarczyk, Grazyna
    ARTIFICIAL INTELLIGENCE AND SOFT COMPUTING, ICAISC 2022, PT II, 2023, 13589 : 336 - 345