Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method

被引:0
|
作者
Zhang, Xinjin [1 ]
Liu, Weining [1 ]
Lu, Meili [1 ]
机构
[1] School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:142 / 146
相关论文
共 44 条
  • [41] Risk Identification and Responses of Tunnel Construction Management during the COVID-19 Pandemic
    Wang, Zhimin
    Liu, Zixiao
    Liu, Junyan
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [42] Identification and Gradation of Risk Sources in Subway Station Construction Based on Hole-pile Method
    Geng, Dongyang
    Cao, Lijun
    Yu, Xiangmei
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1020 - 1023
  • [43] A safety risk assessment method for TBM tunnel construction based on attribute interval identification theory
    Bo Wang
    Qikai Li
    Zefan Xu
    Shibin Niu
    Xiangtian Nie
    Scientific Reports, 15 (1)
  • [44] INFLUENCE OF HIGH-RISK AND LARGE-SPAN METRO STATION CONSTRUCTION BY DRIFT-PBA METHOD ON ADJACENT GROUND AND PIPELINES
    Wang, Ting
    Liu, Weining
    Luo, Furong
    Li, Xinggao
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 648 - 653