共 50 条
- [1] A capacity planning model in the TFT-LCD production chain [J]. PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, 2007, : 460 - +
- [2] A Hierarchy method for TFT-LCD Production Chain Planning [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 12 - 15
- [3] A hierarchical planning and scheduling framework for TFT-LCD production chain [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI 2006), PROCEEDINGS, 2006, : 711 - +
- [4] A Capacity Planning Model for TFT-LCD Production Networks [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1663 - 1668
- [6] An available-to-promise model for TFT-LCD production chain [J]. PROCEEDINGS OF THE 14TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A AND B: BUILDING CORE COMPETENCIES THROUGH IE&EM, 2007, : 23 - 28
- [7] Aggregate Production Planning with Small Data in TFT-LCD Manufacturing [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 647 - 648
- [9] And completes TFT-LCD mass production line [J]. MICROELECTRONICS JOURNAL, 1995, 26 (07) : R8 - R8
- [10] Quality Improvement in Cleaning Process for TFT-LCD Production [J]. JOURNAL OF AERONAUTICS ASTRONAUTICS AND AVIATION, 2014, 46 (04): : 249 - 259