共 50 条
- [1] A capacity planning model in the TFT-LCD production chain [J]. PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS, 2007, : 460 - +
- [2] A Capacity Planning Model for TFT-LCD Production Networks [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 1663 - 1668
- [3] A Hierarchy method for TFT-LCD Production Chain Planning [J]. 2009 IEEE 16TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2, PROCEEDINGS, 2009, : 12 - 15
- [4] A hierarchical planning and scheduling framework for TFT-LCD production chain [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI 2006), PROCEEDINGS, 2006, : 711 - +
- [5] Aggregate Production Planning with Small Data in TFT-LCD Manufacturing [J]. 2015 INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2015, : 647 - 648
- [6] Product mix in the TFT-LCD industry [J]. PRODUCTION PLANNING & CONTROL, 2007, 18 (07) : 584 - 591
- [9] Facility Planning for TFT-LCD Array Fab [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 641 - +
- [10] Deposition technology for TFT-LCD production savings [J]. SOLID STATE TECHNOLOGY, 2008, 51 (03) : 40 - 41