Improving cement plant performance with O&M contracts

被引:0
|
作者
Harder, Joachim [1 ]
机构
[1] OneStone Consulting S.L., Barcelona, Spain
来源
ZKG International | 2017年 / 70卷 / 04期
关键词
Kilns - Cement plants - Technology transfer;
D O I
暂无
中图分类号
学科分类号
摘要
Decreasing capacity utilization rates and financial constraints are reasons for the ongoing performance improvements of cement plants. O&M contracts can be the solution to achieve these objectives when technical solutions are getting more complex and when operational know-how is limited. This article will look at this approach more closely. Cement plants differ in plant age, size, technology, automation, fuel supply, operational and maintenance requirements and other issues. More CapEx is spent on the latest technology, to reduce operational and maintenance costs. Sometimes it is very difficult to compare individual plants. Plants with several kiln lines, which use identical raw materials, can compare the efficiency of the individual kiln lines more effectively than an isolated plant with one kiln line.
引用
收藏
页码:30 / 36
相关论文
共 50 条
  • [41] Taking the mystery out of O&M
    Gilnack, GM
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1998, 90 (08): : 10 - 10
  • [42] PM workorders, not O&M requirements
    Building Solutions Group, Richard D. Kimball Company, Inc., Andover, MA
    Eng syst, 2008, 1 (112):
  • [43] Solving O&M problems on the Net
    Miller, EG
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 1999, 91 (05): : 10 - 10
  • [44] O&M—Key to Customer Satisfaction
    Lay, Trudie
    Opflow, 1994, 20 (03)
  • [45] Energy efficient O&M for airport
    Manczyk, H
    ASHRAE JOURNAL, 2000, 42 (07) : 43 - 44
  • [46] Building the best O&M toolkit
    Lacey, M
    JOURNAL AMERICAN WATER WORKS ASSOCIATION, 2001, 93 (05): : 2 - 2
  • [47] O&M strategy for the Chacao Bridge
    Laigaard, J.
    Jensen, L.
    Langlois, A.
    Valenzuela, M. A.
    MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 532 - 532
  • [48] Intelligent approach to improve O&M
    Slaybaugh, Rachel
    NUCLEAR ENGINEERING INTERNATIONAL, 2020, 65 (793): : 35 - 37
  • [49] O&M problems not caused by cycling
    Jackson, Peter S.
    Moelling, David S.
    Malloy, James W.
    POWER, 2007, 151 (05) : 25 - +
  • [50] Next-Gen O&M Solutions: Transforming the Landscape of Power Plant Productivity
    Machon, Doug
    Power, 2024, 168 (10) : 16 - 18