共 50 条
- [22] ADVANCED FABRICATION AND ERECTION TECHNIQUES FOR LONG SUSPENSION BRIDGE CABLES JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (01): : 112 - 129
- [23] Center Tower Stiffness Study in Multi-tower Suspension Bridge ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1082 - +
- [25] Constraint analysis on the steel mid tower of a tri tower suspension bridge ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 79 - +
- [26] Research on Load Swing and Rotation Control Techniques during Transmission Line Tower Erection 2024 15TH INTERNATIONAL CONFERENCE ON MECHANICAL AND INTELLIGENT MANUFACTURING TECHNOLOGIES, ICMIMT 2024, 2024, : 57 - 62
- [27] Cable erection technology for world's longest suspension bridge - Akashi Kaikvo Bridge Nippon Steel Technical Report, 1997, (73): : 59 - 70
- [29] The key quality control technology of main cable erection in long-span suspension bridge construction 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
- [30] Fatigue Behavior of Hangers on a Three Tower Suspension Bridge 2016 INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY, ENVIRONMENT AND INFORMATION ENGINEERING (SEEIE 2016), 2016, : 525 - 531