Traffic Congestion Scheduling for Underground Mine Ramps Based on an Improved Genetic Scheduling Algorithm

被引:0
|
作者
Miao, Wenkang [1 ,2 ]
Zhao, Xingdong [1 ,2 ]
机构
[1] Northeastern Univ, Key Lab Ground Control Management Plan Deep Met Mi, Natl Mine Safety Adm, Shenyang 110819, Peoples R China
[2] Northeastern Univ, Sch Resources & Civil Engn, Shenyang 110819, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 21期
基金
中国国家自然科学基金;
关键词
underground mine; ore transport; genetic algorithm; mining simulation; intelligent scheduling; OPTIMIZATION; SYSTEM;
D O I
10.3390/app14219862
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The dispatching of trackless transportation on the ramp of underground metal mines is closely related to the transportation efficiency of daily production equipment, personnel, and construction materials in the mine. The current dispatching of trackless transportation on the ramp of underground metal mines is discontinuous and imprecise, with unscientific vehicle arrangement leading to low efficiency and transportation congestion. This paper presents this study, which puts forward a kind of trackless transportation optimization method that can fully make use of the ramp in the roadway, and the slow slope fork point can be used for the trackless transportation vehicle passing section to improve the efficiency of trackless transportation on the ramp. This study adopts the principles of fuzzy logic and uses interval-based positioning instead of real-time positioning to effectively reduce the spatial complexity inherent in the algorithm. At the same time, this research presents a modified genetic algorithm that incorporates a time-loss fitness calculation. This innovation makes it possible to differentiate traffic priorities between different types of vehicles, thus bringing the scheduling scheme more in line with the economic objectives of the mining operations. Various parameters were determined and several sets of simulation experiments were carried out on the response speed and scheduling effect of the scheduling system, resulting in a 10 to 20 percent improvement for different vehicles in the efficiency of underground mining transport operations.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] Research on Shipboard Material Scheduling Optimization Based on Improved Genetic Algorithm
    Li, Jinghua
    Huang, Wenhao
    Yang, Boxin
    Zhou, Qinghua
    INTERNATIONAL CONFERENCE ON MECHANICAL DESIGN AND SIMULATION (MDS 2022), 2022, 12261
  • [32] A Novel Production Scheduling Approach Based on Improved Hybrid Genetic Algorithm
    Dai, Lili
    Lu, He
    Hua, Dezheng
    Liu, Xinhua
    Chen, Hongming
    Glowacz, Adam
    Krolczyk, Grzegorz
    Li, Zhixiong
    SUSTAINABILITY, 2022, 14 (18)
  • [33] Application research based on improved genetic algorithm in cloud task scheduling
    Sun, Yang
    Li, Jianrong
    Fu, Xueliang
    Wang, Haifang
    Li, Honghui
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (01) : 239 - 246
  • [34] Research on Shipboard Material Scheduling Optimization Based on Improved Genetic Algorithm
    Yuan, Feihui
    Li, Jinghua
    Zhou, Qinghua
    He, Ming
    WIRELESS COMMUNICATIONS & MOBILE COMPUTING, 2022, 2022
  • [35] Research on Shipboard Material Scheduling Optimization Based on Improved Genetic Algorithm
    Yuan, Feihui
    Li, Jinghua
    Zhou, Qinghua
    He, Ming
    Wireless Communications and Mobile Computing, 2022, 2022
  • [36] Scheduling arrival aircrafts on multiple runways based on an improved genetic algorithm
    Yang, Qiu-Hui
    You, Zhi-Sheng
    Feng, Zi-Liang
    Hong, Mei
    Sichuan Daxue Xuebao (Gongcheng Kexue Ban)/Journal of Sichuan University (Engineering Science Edition), 2006, 38 (02): : 141 - 145
  • [37] Trip Frequency Scheduling for Traffic Transportation Management based on Compact Genetic Algorithm
    Olarthichachart, Piyapong
    Kaitwanidvilai, Somyot
    Karnprachar, Surachet
    INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS (IMECS 2010), VOLS I-III, 2010, : 1072 - +
  • [38] TSN Traffic Scheduling and Route Planning Mechanism Based on Hybrid Genetic Algorithm
    Zheng, Zelin
    Wu, Qian
    Lv, Wei
    Gao, Qiang
    Weng, Junhong
    Lin, Peng
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON COMPUTER ENGINEERING AND NETWORKS, VOL III, CENET 2023, 2024, 1127 : 269 - 280
  • [39] Project Scheduling Based on Genetic Algorithm
    Ma, Ji
    2009 IEEE INTERNATIONAL CONFERENCE ON GRANULAR COMPUTING ( GRC 2009), 2009, : 434 - 439
  • [40] Genetic Algorithm based gain scheduling
    Kimiaghalam, B
    Homaifar, A
    Bikdash, M
    Sayyarrodsari, B
    CEC'02: PROCEEDINGS OF THE 2002 CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1 AND 2, 2002, : 540 - 545